Similar Projects
Last Updated | 08/30/2022 12:03 PM |
Project Title | North Carolina State University Page Hall Mechanical and Electrical Upgrade |
Physical Address | View project details and contacts |
City, State (County) | Raleigh, NC 27607 (Wake County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $8,200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate - 08/08/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | North Carolina State University is seeking qualification statements from general contractors for improvements to Page Hall Mechanical & Electrical Upgrade, located on North Campus. The project scope includes new mechanical, electrical, and plumbing systems; new LED lighting; roof replacement; building insulation and window upgrades, and minor architectural modifications and interior finish upgrades. The building will not be occupied during the renovation. Bids will be received for single prime bid contracts. All Proposals will be lump sum. The following General Contractors have been pre-qualified to bid this job: Bar Construction- Greensboro, NC Bolton Construction & Service- Raleigh, NC Brawley Company- Raleigh, NC BridgePoint General Contracting- Durham, NC CMC Building, Inc- Bolton, NC CT Wilson Construction Co- Durham, NC Dewberry Design-Builders-Raleigh, NC HITT Contracting- Falls Church, VA L. Long Construction- Winston Salem, NC E. Dunn Construction Co- Raleigh, NC M. Thompson Co- Cary, NC Lomax Construction- Greensboro, NC McDonald York Building Co- Raleigh, NC Messer Construction Co- Raleigh, NC MLB Construction Services- Apex, NC Muter Construction- Zebulon, NC Resolute Building Co- Chapel Hill, NC Riley Contracting Group- Cary, NC Romeo Guest Associates- Durham, NC The State reserves the unqualified right to reject any and all proposals. North Carolina State University has an affirmative policy of fostering, promoting, and conducting business with minority-owned enterprises. Minority contractors are encouraged to participate in the bidding process. The bidder must include completed minority business subcontractor documentation form(s) with their proposal or the bid may be considered non-responsive and invalid. Notice of Public Meeting for Proposed Alternate Bids for Preferred Products: An open public meeting will be held on August 17, 2022, at 1:30 PM at Page Hall, 21 Current Drive, Raleigh, NC 27607. The meeting is to identify preferred brand alternates and their performance standards pertinent to this project. In accordance with GS133-3, Section 64. (C) and State Construction Office procedures the following preferred brand items are being considered as Alternates by the owner for this project: OPA-01 Fire Alarm Controls: FCI, Notifier, Simplex OPA-02 Fire Alarm Dialers: Firelite MS-1OUD OPA-03 Condensate Meter: Cadillac CMAG magnetic flowmeter OPA-04 Electricity Meter: Nexus 1262 OPA-05 Building HVAC Controls: Johnson Controls, Inc., Schneider Electric OPA-06 Door Hardware: Best Locksets at new doors OPA-07 Door Hardware: Closers LCN OPA-08 Keys Schlage, Best OPA-09 Cores: Schlage, Best Small format interchangeable) OPA-13 Specialties: Bobrick Contura Series Surface-mounted Sanitary Napkin Disposal Model B-270 OPA-14 Specialties: Bobrick Trim line Series Surface Mounted Sanitary Napkin/Tampon Vendor Model B2800 A copy of pertinent sections of the performance standards may be obtained by contacting the designer at the address or phone number noted above. Laura Zaytoun North Carolina State University Capital Project Management llzaytou@ncsu.edu 919.515.8049 |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |