Similar Projects
Imagine Clearwater Park (Buildings, Hardscape, Landscape and Other Site Improvements)
New Construction
Sub-Bidding
Clearwater, FL 34621

Asphalt Replacement, Sealing and Striping at Redwood Apartments
Post-Bid
Saint Petersburg, FL 33709

Channel 1 Concrete Panel Replacement West of 66th Street
Post-Bid
Pinellas Park, FL 33781

Pinellas Trail and 54th Avenue North Drainage Improvements (Pid # 000183A)
Results
$2,479,385 est. value
FL

I-275 Bus on Shoulder
Results
FL

Channel 5 Rip Rap Repairs Project
Post-Bid
Less than $100,000 est. value
Pinellas Park, FL 33781

Drainage Improvements for Third, Fourth, Fifth and Sixth Street BMP 3 and 4
Results
$328,559 est. value
Belleair Beach, FL 33786

Pavement Services at Lakeside Terrace Apartments
Post-Bid
Largo, FL 33781

Palm Avenue Drainage Improvements
Results
Less than $580,000 est. value
Tarpon Springs, FL 34688

Asphalt Improvements at East Lake Club Apartments
Post-Bid
Oldsmar, FL 34677

Citywide Street Milling and Resurfacing
Results
Saint Petersburg, FL 33731

Two Mini Circles on 79th Street South at 2nd Avenue and 4th Avenue
Post-Bid
Saint Petersburg, FL 33707

Pavement and Roadway Infrastructure Rehabilitation Annual Purchase Agreement
Results
Largo, FL 33779

Roadways and Public Rights-of-Way Minor Improvements
Post-Bid
Saint Petersburg, FL 33731

Drainage Improvements
Results
Less than $181,865 est. value
FL

Last Updated 05/19/2020 03:37 AM
Project Title

Pent Street and Grosse Avenue Drainage and Roadway Improvements

Physical Address View project details and contacts
City, State (County) Tarpon Springs, FL 34689   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,496,724
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of removal and reconstruction of roadway surface of Grosse Avenue between Tarpon Avenue and Live Oak Street in Tarpon Springs, Florida. The new surface will be asphalt. Stormwater infrastructure is a significant part of the project including new and expanded stormwater management facilities, drainage conveyance additions, and a new outfall to the Anclote River. The project also includes new sanitary sewer and potable water infrastructure. The project is also a Southwest Florida Water Management District Cooperative Funding Initiative project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents