Similar Projects
Kroger #118-01 - Site Work Only
New Construction
Design
Spring, TX 77388

Annual Requirements Contract for Directional Boring Services and Drill Shafts
Results
$313,905 est. value
Arlington, TX

Relocation and Leveling of Portable Buildings and Ramps
Results
Dallas, TX

Wesco Office Building - Site Work Package
New Construction
Construction
Austin, TX 78735

Air Center Distribution Center Detention Pond
New Construction
Construction
Houston, TX 77000

Firearms Training Facility Site Improvements
Results
Sherman, TX 75090

The Grid Phase II Pad Sites
New Construction
Construction
Stafford, TX 77477

Vintage Farms Subdivision Phase 2
Results
Less than $1,600,000 est. value
TX

Heb Parking Lot Expansion / Hike And Bike Trail
New Construction
Construction
Dallas, TX 75206

Arrowhead Farms Subdivision Phase 1
Results
Less than $1,700,000 est. value
Caldwell, TX 77836

O'Reilly Auto Parts Parking Lot Addition
New Construction
Construction
Sanger, TX 76266

Core Drilling Services
Results
Fort Worth, TX 76133

Clements Ranch Phase 6 Excavation Improvements
New Construction
Construction
Forney, TX 75023

Core Drilling Services
Results

Clements Ranch Phase 5 Excavation Improvements
New Construction
Construction
Forney, TX 75023

Last Updated 02/03/2020 07:56 AM
Project Title

Nueces County ADA Site - Improvements

Physical Address View project details and contacts
City, State (County) Corpus Christi, TX 78401   (Nueces County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $223,347
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work for the Base Bid includes modifications to several site elements. Modifications include replacement of sidewalks that are non-ADA compliant. These modifications will require the removal of the existing sections of sidewalks that are not compliant and placement of new concrete sidewalks to meet the requirements of ADA. There are pavement modifications to allow for ADA parking. These modifications will require the removal of existing pavement section to be replaced with new asphalt pavement as noted on the drawings. ADA parking will be required to have access aisles and pavement markings. Additionally, there will be ADA parking signage. The scope of work for the Alternate Base Bid includes modifications to several site elements. Modifications include replacement of sidewalks that are non-ADA compliant. These modifications will require the removal of the existing sections of sidewalks that are not compliant and placement of new concrete sidewalks to meet the requirements of ADA. There are pavement modifications to allow for ADA parking. These modifications will require the removal of existing pavement section to be replaced with new asphalt and concrete pavement as noted on the drawings. ADA parking will be required to have access aisles and pavement markings. Additionally, there will be ADA parking signage.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents