Similar Projects
Drainage Improvements Of The Miller Ditch Md-L51 (Pine Pasture Road To Jeff Davis Parish) In Ward 2
Infrastructure
Results
Lake Charles, LA

New Offices And Shop For Cameron Parish Drainage District #7
Infrastructure
Post-Bid
$900,000 est. value
Sulphur, LA

Wastewater Treatment Plant Oxidation Pond Repairs
Renovation, Infrastructure
Post-Bid
Iowa, LA

Program Management of the Critical Drainage Improvement
Infrastructure
Results
Lake Charles, LA

Burton Dorm Flood Repairs
Infrastructure
Results
$10,000 est. value
Lake Charles, LA

LA 378 - Up Rr Crossing (Westlake)
Infrastructure
Results
$250,000 to $500,000 est. value
Westlake, LA 70669

West Oak Lane Drainage
Infrastructure
Post-Bid
Lake Charles, LA

Metal Pipe
Infrastructure
Results
Lake Charles, LA

Aluminum Pipe
Infrastructure
Results
Lake Charles, LA

College Heights Detention Pond Rehabilitation
Infrastructure
Post-Bid
LA

M/V New Roads - 2021 Uscg Drydock
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

St. Louis Area Drainage Rehabilitation
Infrastructure
Post-Bid
Lake Charles, LA

West Shore Lake Pontchartrain, Bottomland Hardwood, Louisiana Project, CEMVN
Term Contract
Results
$10,000,000 est. value

Hurricane and Storm Damage Risk Reduction
Term Contract
Design
$5,000,000 to $10,000,000 est. value

Oak Park Lateral Drainage Improvements
Infrastructure
Results
Lake Charles, LA

Reported 03/16/2022 12:00 AM
Project Title

Louisiana Avenue South of Mcneese Drainage Improvements

Physical Address View project details and contacts
City, State (County) Lake Charles, LA   (Calcasieu County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new underground drainage system to better serve Louisiana Avenue south of McNeese Street. This new system will tie into McNeese Street, run south along the east property line of F.K. White Middle School, and then turn east along the south property line of the Entergy Substation. The system will cross to the east side of Louisiana Avenue at this location. Additionally, this underground system will extend south in the existing west roadside ditch of Louisiana Avenue approximately 650 feet. This new underground system will consist of new drainage inlets and pipe ranging from 15” to 48” in diameter, as well the associated pavement work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents