Similar Projects
Vance Air Force Base Repair Roof
Term Contract
Results
$250,000 to $500,000 est. value
Enid, OK 73703

"On Call" Roofing Repairs, Replacement And Service
Alteration
Post-Bid

Install New Roof Coating on Facility 690 Vance Air Force Base
Alteration
Post-Bid
$500,000 to $1,000,000 est. value
Enid, OK 73705

Construct Allied Support For Temporary Fire Station Bunk Rooms
New Construction
Results
Enid, OK 73701

USACE, Tulsa District WOSB MATOC
New Construction
Design
Less than $49,500,000 est. value

Renovate Officer Unaccompanied Housing F645
Renovation
Results
$1,000,000 to $5,000,000 est. value
Enid, OK

TAC Roof Program B9001 - Multiple Award Task Order Contract (MATOC)
Post-Bid
$2,000 to $15,000,000 est. value

Repair Roof At F305
Term Contract
Post-Bid
$25,000 to $100,000 est. value
Enid, OK 73703

Enid Fire Station 1 Roof
Renovation
Post-Bid
$127,500 CJ est. value
Enid, OK 73701

Renovate Aircraft Maintenance Backshops for Decontamination Room B128
Renovation
Post-Bid
$250,000 to $500,000 est. value
Enid, OK

Great Plains Building Roof Replacement
Alteration
Results
Enid, OK 73701

Roofing IDIQ- Plains Area - South
Results
$2,000 to $3,000,000 est. value

IDIQ Express Menu Small Project Construction Services - Western Oklahoma
New Construction
Design

Convention Hall Weather Proofing
Alteration
Results
Enid, OK 73701

Repair East & West Lean To Roof B187
Alteration
Results
Enid, OK 73703

Last Updated 08/04/2022 02:04 AM
Project Title

VANCE AFB Repair Roof of Operations Group F672

Physical Address View project details and contacts
City, State (County) Enid, OK 73703   (Garfield County)
Category(s) Government/Public, Single Trades
Sub-Category(s) Military Facility, Roofing
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Description: ASRC, Arctic Slope Regional Corporation Federal, LTD under the BOS contract FA3002-16-C-0004 is contemplating the issue of solicitation The Contractor shall furnish all supervision, labor, equipment, consumable materials, supplies, tools, and other items to complete the construction as listed in the scope of work. All quotes shall include all shipping charges. The contractor will coordinate all work with ASRC Federal Field Services (AFFS) Construction Management prior to execution. The list of items below are to be considered the general scope of work for the project. Restore existing roof at facility 672. Additional details are described in Statement of Work, Specifications and Drawings. Notice to Offeror (s)/Supplier (s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any cost. Qualifications: The lowest responsible bidder is the contractor whose bid was in substantial conformity to the Specifications and Plans and who have satisfactory previous experience in the types of work contained in this solicitation and have a successful track record performing the types of work contained in the projectThe dollar amount is only one factor in determining the lowest responsible bidder. Award: The contract cannot be awarded until the USG has received and accepted the winning proposal. Upon receipt of concurrence from the Government the Contracting Officer will execute the contract to the winning bidder. In the absence of funding no contract will result. Should funds be provided, to be considered for award of this project a contractor must be aware at Vance AFB also has strict Base access regulations and commercial inspections are mandatory with each entry to the facility. There shall be no legal liability on the part of the Government or ASRC should funding not be provided. Bid Evaluation: ASRC Federal must consider a bidder's experience, reputation for satisfactory work, reference checks, financial, technical competence, Duns & Bradstreet evaluation, and Past Performances. Site Visit: 7 July 22 at 10:00am CST An offer bond is required for all construction offers in excess of $25,000.00. . The Contractor shall furnish all supervision, labor, equipment, consumable materials, supplies, tools, and other items to complete the construction as listed in the scope of work. All quotes shall include all shipping charges. The contractor will coordinate all work with ASRC Federal Field Services (AFFS) Construction Management prior to execution. The list of items below are to be considered the general scope of work for the project

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents