Similar Projects
Airport Site Development
Infrastructure
Conception
Gulfport, MS

Brantley Ellison Fitness / Biloxi
New Construction, Infrastructure
Conception
Biloxi, MS 39532

Biloxi MATOC - Seed Project Project
New Construction
Design
Biloxi, MS

Flamingo Beach Inn & Comfort Inn/Choice Hotels Redevelopment
New Construction, Renovation, Infrastructure
Design
$15,000,000 CJ est. value
Biloxi, MS 39531

Hurricane Zeta Timber Pier Repairs
Infrastructure
Bidding
$325,000 CJ est. value
Gulfport, MS 39501

Asphalt Repair and Overlay of Lynn Circle
Infrastructure
Bidding
$2,000,000 CJ est. value
Pass Christian, MS 39571

CTA Tram, Bike & Pedestrian Bridge
Infrastructure
Post-Bid
$200,000 CJ est. value
Gulfport, MS 39501

Rehabilitate Airfield Drainage Phase 2B FAA Airport Improvement Program Project
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Gulfport, MS 39503

Hiller Park Boat Launch Improvements
Infrastructure
Results
$448,560 CJ est. value
Biloxi, MS 39531

Anniston Elementary Addition
Addition, Demolition, Renovation, Infrastructure
Results
$3,519,000 CJ est. value
Gulfport, MS 39507

Jiffy Lube / D'iberville
New Construction, Infrastructure - 3,438 SF
Construction
$1,500,000 CJ est. value
Diberville, MS 39540

Beach Vista Apartments
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Biloxi, MS 39531

The Bella Condominiums
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Biloxi, MS 39530

Hillside Baptist Church / Harrison County
New Construction, Infrastructure - 4,320 SF
Pending Verification
$750,000 CJ est. value
Gulfport, MS 39503

Collins Street Residences
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Biloxi, MS 39530

Last Updated 07/11/2023 09:12 AM
Project Title

Gulf Coast Veterans Health Systems Renovate Building 1

Physical Address View project details and contacts
City, State (County) Biloxi, MS 39531   (Harrison County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected January 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 11, 2023 this project will rebid but no definite date yet.** CONTRACT NO. VA101F-17-D-2902, 36C10F18R0660 36C10F23R0004 RFI SUBMISSION SHEET RFI NUMBER RFI RESPONSE 1 From my understanding, the amendment states that the ceiling lift portion (equipment only) will be removed from the scope of work for solicitation 36C10F23R0004. Instead, the ceiling lift equipment will be purchased directly by the VA in the future. However, the installation portion of the work will remain within the existing solicitation, making it the contractor's responsibility. Could you please confirm if my understanding is correct The intent is that the VA will purchase the equipment concurrent with this construction contract so that the Contractor can coordinate the installation with the other activities of this construction contract. The Contractor will be responsible for the installation of the system as outlined in the previous Amendment. 2 Furthermore, the initial solicitation was released as a sole source contract for Guldmann. However, it came to my attention that the justification for this sole source determination was deemed unreasonable and overturned. I would like to inquire if the new solicitation will be reissued as an open source contract instead. As Amendment A0003 changed the lifts from CC to VC, no new amendment will be issued or a new solicitation.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents