Last Updated | 12/30/2022 06:02 PM |
Project Title | Three RAs - ARPA Dam and Culvert Improvements |
Physical Address | View project details and contacts |
City, State (County) | Lansing, MI 48933 (Ingham County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $350,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of December 30,2022 project was awarded to GEI Consultants of Michigan, P. C but awarded amount is not available.** PROJECT DESCRIPTION/SERVICES REQUESTED The DNR seeks the services of a qualified engineer to develop plans for dam repairs and culvert replacement at the following locations: Bald Mountain Recreation Area: 1. Prince Lake Dam Repairs 2. Lower Trout Lake Dam Repairs 3. Upper Trout Lake Dam Repairs 4. Upper and Lower Trout Lake Culvert Replacement Holly Recreation Area: 1. Heron Dam Repairs 2. Wildwood Dam Repairs Metamora-Hadley Recreation Area: 1. Minnewanna Dam Repairs The Professional Services Contractor (PSC) is to provide Phase 400 Preliminary Design, Phase 500 Final Design / Bidding Documents, Phase 600 Construction Administration - Office Services, and Phase 700 Construction Administration - Field Inspection Services. Please include the following in your proposal: o Design Review meetings to be held at a minimum of 50% and 90% reviews for Phase 400 and Phase 500 and as the PSC deems necessary. Microsoft Teams meetings are acceptable. o The PSC shall be responsible for running construction progress meetings twice a month for the duration of the project, including a pre-construction meeting. o Please include a probable cost estimate for the anticipated work o Two weeks review time is anticipated for each submission. Other items of note: o Work to include evaluation of existing gates (will need to send a diver down at Lower Trout and Heron). Lower Trout Dam draw-down gate has a bent rod and needs repair. o Wildwood has a submerged outlet pipe and will need a ROV camera. o All sites will need outlet pipe evaluation for replacement or new lining. o Minnewanna has a broken railing that needs replacement (Photo #8) and concrete patchwork at box culvert (Photo #21). o Heron Dam has a "boil" near the outlet with seepage issues in multiple locations and may need a monitoring well with stability calculations. o Erosion control recommendations are desired where footpaths deteriorate and require constant DNR maintenance. ACCEPTING RFP QUESTIONS UNTIL: November 3, 2022, at 2:00 p.m ALL questions should be emailed to Sheryl Ananich at ananichs@michigan.gov address no later than 2:00 p.m., Eastern PROJECT ADDRESS (if applicable) Bald Mountain Recreation Area - 1330 E Greenshield Rd, Lake Orion, MI 48360-2307 Holly Recreation Area - 8100 Grange Hall Rd, Holly, MI 48442 Metamora-Hadley Recreation Area - 3871 Herd Rd, Metamora, MI 48455 LEIN Check (Department of Corrections ONLY) All contractor / vendor representatives attending Preproposal Walk Through Meeting must submit a Vendor / Contractor LEIN Request form five business days prior to the meeting date (See the attached Vendor/Contractor LEIN Request Form). Send the LEIN Request form, filled and signed, by email to Daniel T. Smith at email address: smithD76@michigan.gov . The email "Subject" must include (facility name, project name, date and time of Pre-Proposal Walk Through Meeting). |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |