Similar Projects
Albemarle Landing
New Construction
Conception
$24,500,000 est. value
Charlotte, NC 28212

Rock Quarry Landing
New Construction
Design
$34,000,000 est. value
Raleigh, NC

The Commons of Forsyth County Preschool
New Construction, Renovation
Design
Winston-Salem, NC 27101

Battle Park Multi-Use Natural Surface Trail
New Construction
Bidding
$125,000 est. value
Rocky Mount, NC

Cedar Creek Middle School Soccer Field
Renovation
Bidding
Louisburg, NC 27596

North Waterfront Park Project
Post-Bid
Wilmington, NC

Hoover Road Athletic Park
Post-Bid
Less than $8,500,000 est. value
Durham, NC

Cape Fear River Trail Phase II - Part C
Results
Less than $2,424,242 est. value
Fayetteville, NC

Replacement of the Smithfield-Selma Senior High School Visitor Football Grandstand Bleachers
Results
Less than $223,292 est. value
Smithfield, NC 27577

Hoke Loop Commons
New Construction - 88,610 SF
Construction
Fayetteville, NC

Zebulon Green
New Construction - 88,610 SF
Construction
Zebulon, NC

Ballantyne Reimagined - Stream Park
New Construction
Design
Charlotte, NC 28277

Tennis Court Demolition and Reconstruction of 4 Existing Courts and Addition Of 2 New Courts
Demolition, Infrastructure
Bidding
Shallotte, NC 28470

Pleasant Park
Post-Bid
Less than $36,000,000 est. value
Apex, NC 27502

Clarence Lee Tart Memorial Park Improvements
Results
Dunn, NC

Last Updated 06/01/2021 03:33 PM
Project Title

Hanes Park Phase 2 Improvements

Physical Address View project details and contacts
City, State (County) Winston-Salem, NC 27101   (Forsyth County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of improvements to the Joe White Tennis Center building, restrooms & pavement /drainage, renovating the hard surface tennis courts and constructing a new park entrance off West End Blvd in the northeast end of the park. The area proposed in Phase II improvements are called out on the plans as Area #1, Area #2, Area #3, and Area #4. The scope of work includes, but is not limited to, the following: 1. Site work: clearing, erosion control, site grading, new asphalt paving, site steps, site walkways, site concrete. 2. Storm drainage 3. Tennis Court and other site lighting 4. Tennis Court Reconstruction (6 courts) 5. Pickle Ball Court Reconstruction (3 courts) 6. Fencing 7. Stone walls 8. Concrete walks 9. Site Utilities 10. Site Furniture 11. Landscaping (trees, shrubs, seeding, mulch) 12. Renovations to the Tennis Center building, including: a. New shingle roof. b. Painting. c. Interior walls. d. Doors. e. Epoxy floor. f. Mechanical. g. Electrical. h. Plumbing.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents