Similar Projects
Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Crafco Pavement Repair, Equipment, Supplies, Parts, and Repair Services
Infrastructure
Post-Bid
Montpelier, VT

Waterford - St Johnsbury IM 091-3(52) and Barnet IM 091-2(82)
Results
$1,000,000 to $2,500,000 est. value
Barnet, Saint Johnsbury, Waterford, VT

East Darling Hill Road Reconstruction and Bike Path
Results
$500,000 to $1,000,000 est. value
Burke, VT 05832

Boardwalk Construction
Addition, Infrastructure
Post-Bid
$100,000 est. value

Groton-Newbury STP PS19 (2)
Results
$5,000,000 to $10,000,000 est. value
Groton, Newbury, VT

Statewide AV-FY23-003
Infrastructure
Post-Bid
$250,000 to $500,000 est. value
VT

Retainer Contracts for Asphalt Paving, Sealing & Striping Services Statewide
Term Contract
Results
$500,000 est. value

Joes Pond Ramp Reconstruction
Infrastructure
Post-Bid
$85,000 est. value
Danville, VT 05873

Statewide - Southern Region Stp Crak(42)
Results
$1,000,000 to $2,500,000 est. value

Statewide - Northern Region STP CRAK(41)
Results
$1,000,000 to $2,500,000 est. value

St. Johnsbury WCRL (24)
Infrastructure
Results
$500,000 to $1,000,000 est. value
Saint Johnsbury, VT

Hartland Bt 0153
Infrastructure
Results

Paving Calendar Brook Road
Infrastructure
Results
$334,165 est. value
Sutton, VT 05867

Swanton-St. Johnsbury Stp Lvrt(13)
Infrastructure
Results
$1,000,000 to $2,500,000 est. value
Saint Johnsbury, Swanton, VT

Reported 06/03/2022 12:00 AM
Project Title

Northeast Regional Correctional Facility Paving Improvements

Physical Address View project details and contacts
City, State (County) Saint Johnsbury, VT 05819   (Caledonia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $61,680
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Saint Johnsbury, Vermont. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and sidewalk / parking lot.Contractors are invited to bid on the Northeast Regional Correctional Facility (NERCF) Paving Improvements for Buildings and General Services at the Northeast Regional Correctional Facility located at 1270 U.S. Route 5 in St. Johnsbury, Vermont. This project consists of, but is not limited to: a. Remove and replace existing bituminous pavement along existing access road as shown on the drawings. b. Repair or replace existing stormwater drainage swales, inlet structures and piping along the access road as shown on the drawings. c. Grade and install new bituminous pavement at the visitor parking lot shown on the drawings. d. Remove, replace, and install new concrete sidewalk and curb as shown on the drawings e. Remove and replace existing concrete steps and handicap ramp at the front entrance of the Northeast Region Correctional Facility as shown on the drawings. f. Install stormwater drainage piping at the Caledonia County Work Camp Building C as shown on the drawings. g. Repair erosion at the drainage swale along U.S. Route 5 as shown on the drawings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents