Similar Projects
Summit County Fairgrounds - Phase IA
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Coalville, UT 84017

Olympic View Development
New Construction, Infrastructure - 1,600,000 SF
Conception
$854,000,000 CJ est. value
Park City, UT 84060

Quinns Water Treatment Plant and Signal Hill Area
New Construction, Infrastructure
Design
Park City, UT 84060

Yarrow Park City Mixed-Use
Demolition, New Construction, Infrastructure - 5,000 SF
Design
$116,000,000 CJ est. value
Park City, UT 84060

Slurry Seals Type II, Sealcoat Bike Paths, Rotomilling, Street Overlays, Utility Adjustments, and Crack Seals
Infrastructure
Bidding
$764,550 CJ est. value
Park City, UT 84060

Slurry Seals Type II, Sealcoat Bike Paths, Rotomilling, Street Overlays, Utility Adjustments, and Crack Seals
Infrastructure
Bidding
$764,550 CJ est. value
Park City, UT 84060

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Franklin Spring Rehabilitation Project
Infrastructure
Results
$157,000 est. value
Henefer, UT

Marsac Avenue Water Line Replacement
Infrastructure
Results
Park City, UT 84060

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

Park City Mountain Resort Area Base Master Plan
New Construction, Infrastructure - 27,100 SF
Pending Verification
$76,300,000 CJ est. value
Park City, UT 84060

RFQ Engineering - Bitner Ranch Road to Silver Creek - Intersection Design
Infrastructure
Conception
$400,000 CJ est. value
Park City, UT 84060

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

American Saddler Pipeline Replacement Project
Infrastructure
Results
$500,000 est. value
Park City, UT 84060

Last Updated 04/25/2023 03:59 PM
Project Title

Construction of the Weber Meadowview Ranch Water Improvement Project

Physical Address View project details and contacts
City, State (County) Oakley, UT 84061   (Summit County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,825,931 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 25, 2023, the project has been awarded. A timeline for construction has not been confirmed. The Project generally consists of installation of approximately 9,400 feet of new 8-inch and 10-inch HDPE drinking water pipeline located within Weber Meadowview Ranch. Also included is installing 78 feet of10-inch HDPE via Horizontal Directional Drilling under the Weber Canyon Road. The project also includes furnishing and installing fittings, valves, connection materials, water services, fire hydrants, and miscellaneous appurtenances. Also included is the construction of a new 150,000-gallon reinforced concrete tank along with all appurtenances and site piping. Bid security in the amount of 5 % (percent) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bid Security will be returned to each unsuccessful Bidder after tabulation and award of the Construction Contract. Funding Agency Requirements: This is a federally funded project. The attention of Bidders is directed to the applicable federal and state requirements regarding conditions of employment to be observed. All bidders are required to comply with Executive Order No. 11246 regarding equal employment opportunities. All bidders are required to make the six good faith efforts to assure compliance with the States fair share goals and are required to comply with EEO regulations. All questions relative to the project shall be submitted via email to the Engineer, Jason Bradford, PE - jason@b-t-eng.com. Questions received after November 25, 2022 at 5:00 p.m. may not be answered. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents