Similar Projects
Route 23 Corridor Safety Improvments Chester Co
Infrastructure
Conception
$1,727,000 CJ est. value
Elverson, PA 19520

Route 23 Corridor Safety Improvments Chester Co
Infrastructure
Conception
$1,727,000 CJ est. value
Elverson, PA 19520

Ewing Road /White Clay Creek
Demolition, New Construction, Infrastructure
Design
$1,808,000 CJ est. value
Cochranville, PA 19330

Ewing Road /White Clay Creek
Demolition, New Construction, Infrastructure
Design
$1,808,000 CJ est. value
Cochranville, PA 19330

Horseshoe Pike at Manor Rd.
Infrastructure
Bidding
$2,500,000 CJ est. value
West Brandywine, PA 19343

Horseshoe Pike at Manor Rd.
Infrastructure
Bidding
$2,500,000 CJ est. value
West Brandywine, PA 19343

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Paul Lemen Drive Drainage Improvement Project
Infrastructure
Post-Bid
$300,000 est. value
Phoenixville, PA 19460

State Game Lands #183 Shooting Range Improvements
Results
Palmyra, PA

MS-4 Creek Restoration Project
Infrastructure
Results
Spring City, PA 19475

Tabas Lane Mixed-Use / West Whiteland Township
New Construction, Infrastructure - 13,297 SF
Pending Verification
$3,000,000 CJ est. value
Exton, PA 19341

Honey Brook Residential / Arbor's Edge
New Construction, Infrastructure
Pending Verification
$96,000,000 CJ est. value
Honey Brook, PA 19344

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

West Bridge Street O/AMTRAK
Demolition, New Construction, Infrastructure
Design
$6,800,000 CJ est. value
Parkesburg, PA 19365

Asphalt Resurfacing
Infrastructure
Post-Bid
PA

Last Updated 05/02/2023 01:48 PM
Project Title

Fellowship Road Bridge Repair

Physical Address View project details and contacts
City, State (County) Chester Springs, PA 19425   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $134,404 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the renovation of an existing metal culvert bridge including excavation and replacement of existing fill and roadway, installation of Rip Rap, and installation of concrete collar doweled into the existing foundation in the streambed.Clarification Deadline: 6/7/2022 4:00 PM Proposals shall be accompanied by a bid security in the amount of ten percent (10%) of the total amount of the proposal. Proposals shall be effective for 90 days from the date of opening. The successful low bidder will be required to provide a 100% performance bond or certified check, a 100% payment bond or certified check, a worker's compensation affidavit, and a certificate of insurance naming West Vincent Township and LTL Consultants as additional insureds, all within 20 days after the contract is awarded.Anticipated NTP: Tuesday, July 5, 2022 West Vincent Township reserves the right to waive any non-material defects or irregularities in the bid, and to reject any or all bids or portions thereof. West Vincent Township, in accordance with Title VI of the U.S. Civil Rights Act of 1964 and Parts 21 and 23 of 49 C.F.R., notifies all bidders that it will affirmatively ensure that MBE/WBE will be afforded full opportunity to submit bids in response to this invitation and that no person will be discriminated against on the grounds of race, color, sex or national origin in consideration for an award. Project is to be substantially completed by August 26, 2022. Liquidated damages apply at the rate of $400.00 per calendar day. Proposals must include the Public Works Employment Verification Form completed by the Bidder. Question Deadline 06/07/2022 at 4:00 PM ET

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents