Similar Projects
Combined Sewer Overflow Seperation Project
Infrastructure
Bidding
$2,900,000 est. value
Middletown, CT 06457

Meadow Hill Sanitary Sewer Holding Tank Project
Infrastructure
Bidding
$45,000 to $55,000 est. value
East Hartford, CT 06108

Grease Trap Servicing
Post-Bid
Waterbury, CT 06702

Dawson Avenue Area Sewer and Manhole Rehabilitation Construction
Post-Bid
West Haven, CT

Installation of Low Pressure Sanitary Force Main Riverview Avenue
Results
Branford, CT

Catch Basin, Manhole, Sewer/Drain Line Cleaning and Inspection
Term Contract
Results
Less than $25,000 est. value
Greenwich, CT 06830

Emergency Sewer Services Including Sewer Pump Stations
Infrastructure
Bidding
Berlin, CT

Acceptance and Disposal of Catch Basin Grit
Post-Bid
South Windsor, CT

Manhole Covers, Frames, and Riser Rings; Precast Concrete Catch Basin Tops and Grates
Term Contract
Results
New Britain, CT

Maintenance and Lining of Existing Sewer Mains and Manholes
Infrastructure
Bidding
Meriden, CT

Purchase of Piping, Hydrants, Manholes, Valves, Fittings, and other Appurtenances
Term Contract
Post-Bid
Middletown, CT

Water and Sewer Repairs
Term Contract
Results
Berlin, CT

Purchase of Piping, Hydrants, Manholes, Valves, Fittings and Other Appurtenances
Term Contract
Bidding
Middletown, CT

Replacement of Sewer Lines at Housatonic Valley Regional High School
Post-Bid
Falls Village, CT 06031

Miscellaneous Drainage 2020
Results
South Windsor, CT

Last Updated 10/26/2021 02:34 PM
Project Title

Old Lyme Associations Force Main & Bioxide Station

Physical Address View project details and contacts
City, State (County) Old Lyme, CT   (New London County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status All Bids Received, Selection Underway
Bids Due View project details and contacts
Estimated Value $6,500,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes constructing approximately 160 linear feet of gravity sanitary sewer, approximately 15,950 linear feet of force main, and odor control system, a vortex manhole, sewer construction beneath a bridge over the AMTRAK railroad, restoration of unpaved areas to existing conditions or better, temporary trench repair, permanent trench repair, and State Road Mill and Overlay.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents