Similar Projects
Phase 1 Central Energy Plant - East
New Construction - 431 SF
Bidding
$800,000 est. value
Jamestown, NC 27282

UNCG - Coleman Basketball Lounge Renovation
Renovation
Post-Bid
Greensboro, NC 27400

NC A and T - The Science Building Lab 211
Post-Bid
Greensboro, NC 27411

North Carolina Agricultural and Technical State University Carver Hall Rooms 2nd Level Up-Fit
Results
Greensboro, NC

Benbow Hall Office Renovation
Renovation
Results
Greensboro, NC

Qubein Arena
New Construction
Construction
$100,000,000 est. value
High Point, NC

UNCG Brown Building 109 and 113 Office Renovations
Renovation
Construction
Greensboro, NC 27412

Bluford Library Basement Renovation
Renovation
Post-Bid
Greensboro, NC 27411

Carver Hall Lab 257
Renovation
Results
Greensboro, NC 27411

UNCG Coleman 336 Renovations
Renovation
Post-Bid
Greensboro, NC 27400

UNCG Athletics Coleman Building Weight Room Renovation
Renovation
Results
Greensboro, NC

AV NC A&T State University Engineering Research & Innovation Complex
New Construction - 130,000 SF
Post-Bid
$90,000,000 est. value
Greensboro, NC 27401

GTCC Secondary Data Hub
Renovation - 488 SF
Results
$65,000 est. value
Jamestown, NC

UNCG - the Arts Place at Tate and Gate
New Construction, Demolition - 20,000 SF
Post-Bid
$10,330,306 est. value
Greensboro, NC 27403

Construction of Brown Hall Renovation
Renovation
Results
Greensboro, NC 27411

Last Updated 07/13/2021 12:13 PM
Project Title

Kinesiology Lab Upfit

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27401   (Guilford County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $80,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be constructed in Hines Hall on the campus of North Carolina A & T State University in Greensboro, North Carolina. The University intends to use rooms 101, 102, and 104 in Hines Hall for Kinesiology Labs. Project must be completed, punched, and invoiced by July 30, 2021. This is a hard deadline due to the area being utilized for Fall Semester course. Room 102 requires painting, flooring, and lifting of the ceiling. Based on our initial site visit, we feel that we may be able lift the ceiling approximately 12 inches. General Construction: 1. Removal of the existing ceiling in Room 102. 2. Removal of existing whiteboards. 3. Installation of new ceilings and soffit as required to maximize the ceiling height. 4. Prep, prime, and paint all walls and trim within Room 104 – 1 coat of primer and 2 coats of finish. 5. Prep surface to fill any holes and cosmetic caulking where required.. 6. Flooring - Removal of existing base, installation of University provided rubber flooring, and procurement and installation of new cove base. HVAC: 1. Offsetting the supply duct up as high as possible. 2. Removal and re-installation of existing diffusers in new ceiling grids. Electrical: 1. Raising existing light fixture to match new ceiling heights. 2. Raising existing fire alarm devices as required for new ceiling heights. Room 104 requires painting and flooring. General Construction: 1. Removal of existing shelving. 2. Prep, prime, and paint all walls and trim within Room 104 – 1 coat of primer and 2 coats of finish. 3. Prep surface to fill any holes and cosmetic caulking where required. 4. Flooring - Removal of existing base, installation of University provided turf flooring, and procurement. and installation of new cove base. Room 101 requires painting and flooring. General Construction: 1. Removal of existing whiteboards. 2. Prep, prime, and paint all walls and trim within Room 104 – 1 coat of primer and 2 coats of finish. 3. Prep surface to fill any holes and cosmetic caulking where required.. 4. Flooring - Removal of existing base, installation of University provided turf flooring, and procurement and installation of new cove base.

Details

College/University, 1,136 SF Renovation.
Division 09 - Finishes, Flooring.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents