Similar Projects
Health Department Addition and Alterations
Addition, Demolition, Renovation, Infrastructure
Design
$3,000,000 CJ est. value
Martinsburg, WV 25403

Path Improvements
Infrastructure
Design
$496,000 est. value
Barboursville, WV

Instructional Design Center (IDC)/Distance Learning Center (DLC) Facility
New Construction, Infrastructure - 32,000 SF
Bidding
$25,000,000 CJ est. value
Harpers Ferry, WV 25425

Miscellaneous Construction - Elk St-chapel Rd
Infrastructure
Bidding
$513,000 CJ est. value
Gassaway, WV 26624

First Ave Nitro Traffic Signals +4
Infrastructure
Sub-Bidding
$750,000 CJ est. value
East Bank, WV 25067

Redevelopment of Property 1341 Washington Street East
Infrastructure
Post-Bid
Charleston, WV 25301

Biennial Construction and Maintenance Contract
New Construction, Infrastructure
Post-Bid
Charleston, WV

Site Development - Facility Expansion Project
Results
Summit Point, WV

Slack Plaza Renovations
Infrastructure
Results
Charleston, WV 25301

Meadow River Trail Russellville Bridge Replacement
Demolition, New Construction, Infrastructure
Construction
$981,245 CJ est. value
Fayetteville, WV 25840

Sidewalk
Infrastructure
Construction
$141,765 CJ est. value
Clay, WV 25043

New Ranson and Shepherdstown Elementary Schools
New Construction, Infrastructure - 136,000 SF
Pending Verification
$20,000,000 CJ est. value
Ranson, WV 25438

Ravenswood Industrial Park
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Ravenswood, WV 26164

Menards - Charles Pointe Crossing / Bridgeport
New Construction, Infrastructure - 200,000 SF
Design
$12,000,000 CJ est. value
Bridgeport, WV 26330

Structure Replacement - I-79 Bridge Replacements
Demolition, New Construction, Infrastructure
Bidding
$12,000,000 CJ est. value
Bridgeport, WV 26330

Last Updated 09/26/2022 03:02 PM
Project Title

Contract No. 1 - Rt 9 Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Martinsburg, WV 25401   (Berkeley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Plumbing Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes the rehabilitation of six (6) existing pump stations in the Hedgesville area consisting of: demolition of existing pump station structures and appurtenances; removal and replacement of existing pumps and accessories in existing wet wells at two (2) stations; removal of existing pumps and accessories in existing wet wells and installation of new wet wells along with pumps and accessories at four (4) stations; installation of above ground valve vaults on existing and/or new wet wells at six (6) stations; installation of emergency generators at five (5) stations; installation of 534 LF of 6 PVC C900 forcemain; temporary bypass pumping; piping; electrical work; demolition work; site work; perimeter fence; pre-construction video recording and all other associated work. No bid may be withdrawn for a period of ninety (90) days after the time of the opening of bids. Obtaining the Bidding Documents. Copyright 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. A certified check made out to Berkeley County Public Service Sewer District, or a Bid Bond executed by the Bidder and Bidders surety company approved by the Berkeley County Public Service Sewer District, in the amount equal to five percent (5%) of the bid, shall be submitted with each bid. No bid shall be waived or returned because the bidder failed to or cannot comply with any requirements as set forth in the Plans, Specifications, or any applicable statues of the United States, the State of West Virginia, and/or local ordinance. West Virginia Code 21-1D-5 provides that any solicitation for a public improvement construction contract requires that each vendor that submits a bid for the work to submit at the same time an affidavit of compliance with the bid. The enclosed Drug Free Workplace affidavit must be signed and submitted in the first envelope as evidence of the vendors compliance with the provisions of Article 1D, Chapter 21 of the West Virginia Code. Failure to submit the signed Drug Free Workplace affidavit in the first envelope shall result in disqualification of such bid. The Time of Completion for Contract No. 1 shall be 365 consecutive calendar days beginning with the Award of Contract and written Notice to Proceed. Liquidated damages shall be $1,000.00 per day. Instructions to Bidders For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Bids received after the scheduled closing time for the reception of bids will be returned unopened to the bidders. Berkeley County Service Sewer District reserves the right to reject any and all bids.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents