Similar Projects
Hodgeville Booster Pump Station
New Construction
Bidding
GA

Loganville Water Transmission System Improvements
Bidding
Loganville, GA 30052

Towne Lake and Benton Lift Station Upgrade and Sewer Infrastructure
Post-Bid
Pooler, GA 31322

Lift Station No. 7 Improvements
Post-Bid
Less than $385,000 est. value
Thomasville, GA 31792

Phase I Entrance Road
Results
Savannah, GA 31400

Chattahoochee River Intake Pump Station
Results
Atlanta, GA 30303

Rocky Creek Trunk Sewer Pumping Station
Construction
Augusta, GA 30900

Central Avenue Lift Station Rehabilitation Project
Renovation
Bidding
Savannah, GA 31406

Peachtree Mobile Home Park Pump Station Improvements
Post-Bid
Sugar Hill, GA

SEDA Manufacturing Center Master Lift Station and Force Main and Offsite Water Extension
Results
Less than $5,338,048 est. value
Savannah, GA

PS4036 Gravity Basin CIPP Rehabilitation
New Construction
Bidding
Brunswick, GA 31520

Water Line, Sewer Line, Lift Station
Post-Bid
Waynesboro, GA

South Cobb WRF Influent Lift Station Recovery - Construction Management Services
Results
Marietta, GA 30060

Pump Station Bypass Connections
New Construction, Term Contract
Bidding
Thomson, GA 30824

Construction of J.W. Smith Water Production Plant High Service Pump Station Upgrades
Post-Bid
Hampton, GA 30228

Reported 12/11/2019 12:00 AM
Project Title

Chemical Feed System Installation

Physical Address View project details and contacts
City, State (County) College Park, GA   (Fulton County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors for the lease, maintenance and installation of a chemical feed system; located at the Sanitary Sewer Lift Station #1 off Riverdale Road in College Park GA The project shall include the installation of a 6,000 -gallon polyethylene chemical feed tank. Work include, as an option to install the tank on an existing 12’ x 12’ concrete pad surrounded by an eight ft. (8’) chain link fence. The tank will store magnesium hydroxide, which will be used as an additive to the sanitary sewer system that will decrease the pH level before exiting the City’s Southeast Lift Station .

Details

Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment, Gas and Liquid Purification Process Equipment, Chemical Feed Systems.
Division 46 - Water and Wastewater Equipment, Liquid Chemical Feed Equipment, Liquid Chemical Feed System Coordination and Integration, Dry Chemical Feed Equipment, Dry Chemical Feed System Coordination and Integration.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents