Similar Projects
Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

North Street Drainage Improvement Project
Infrastructure
Bidding
Cleveland, MS 38732

FEMA Mitigation Project, Phase 2 Cemetery Creek Stabilization Project
Infrastructure
Bidding
Oxford, MS

Erosion Repairs at CR 8541
Post-Bid
MS 38829

Drainage Improvements at Tennis Courts/Aquatic Center
Post-Bid
Booneville, MS 38829

Slide Repair
Results
MS

Bank Stabilization on US 84 at the Fair River (Bridge Nos. 74.9A and 74.9B)
Results
MS

Box Culvert and Approaches on County Road No. 7450
Infrastructure
Bidding
MS

Emergency Watershed Protection
Post-Bid
MS

East Pinebrook Drive Drainage Improvement
Results
Brandon, MS

Box Culvert and Approaches
Infrastructure
Bidding
Hinchcliff, MS 38646

West Lincoln Attendance Center Football Field Grading and Drainage Improvements
Post-Bid
Brookhaven, MS 39601

Loyd Star Attendance Center Drainage and Grading Improvements
Results
$125,160 est. value
Wesson, MS 39191

Sportsplex Drainage Improvements
Infrastructure
Bidding
Starkville, MS 39759

Last Updated 02/11/2022 11:37 AM
Project Title

Group 3 EWP projects

Physical Address View project details and contacts
City, State (County) Natchez, MS 39120   (Adams County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Group 3 ewp projects: site 1 – deerfield rd., site 2 – providence rd. #1, site 3 – kudzu ln. #1, site 4 - old meadow rd. #2 - adams county- 2020. The work involves the installation of:mobilization lump sum lump sum clearing grubbing lump sum lump sum removal of obstructions lump sum lump sum unclassified excavation (pm) 4,865.0 cubic yard borrow excavation (contractor furnished) (class 9) (pm) 500.0 cubic yard excess excavation (pm) 3,385.0 cubic yard commercial fertilizer (13-13-13) 0.7 ton seeding 1.4 acre vegetative materials for mulch 1.4 ton loose riprap, 300 lb. 895.0 square yard grouted riprap, 200 lb. 3,315.0 square yard geotextile fabric under rip rap (non-woven) (type 5) (aos \ 0.43) 4,310.0 square yard.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents