Similar Projects
Last Updated | 12/15/2021 10:16 AM |
Project Title | Bridge Superstructure Replacement and Related Work BR No. S-06-003 (Pre-Stressed Concrete Deck Beams) Center Road over Center Brook |
Physical Address | View project details and contacts |
City, State (County) | Savoy, MA 01256 (Berkshire County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,675,513 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | "1.000","Ls","Schedule of Operations - Fixed Price $8,500","100." "0.400","a","Clearing and Grubbing","101." "6.000","Hr","Herbicide Treatment for Invasive Plants","102.3" "6.000","Hr","Invasive Plant Management Strategy","102.33" "1.000","Ls","Demolition of Superstructure of Bridge No. S-06-003","114.1" "950.000","Cy","Unclassified Excavation","120.1" "23.000","Cy","Reinforced Concrete Excavation","127.1" "40.000","Cy","Class a Trench Excavation","141." "10.000","Cy","Test Pit for Exploration","141.1" "278.000","Cy","Channel Excavation","143." "25.000","Cy","Class B Rock Excavation","144." "170.000","Cy","Ordinary Borrow","150." "510.000","Cy","Special Borrow","150.1" "700.000","Cy","Gravel Borrow","151." "62.000","Cy","Gravel Borrow - Type C","151.01" "30.000","Cy","Gravel Borrow for Backfilling Structures and Pipes","151.2" "22.000","Ton","Crushed Stone","156." "1780.000","Sy","Fine Grading and Compacting - Subgrade Area","170." "1.000","Ea","Catch Basin","201." "1.000","Ea","Frame and Grate - Massdot Cascade Type","222.1" "4.000","Ft","12 Inch Drainage Pipe - Option","234.12" "191.000","Sf","Granite Stone Waterway","281.6" "90.000","Cy","Dense Graded Crushed Stone for Sub-base","402." "590.000","Sy","Pavement Fine Milling","415.2" "2670.000","Lb","Calcium Chloride for Roadway Dust Control","440." "8.000","Mgl","Water for Roadway Dust Control","443." "140.000","Ton","Superpave Surface Course - 12.5 Polymer (Ssc - 12.5 - P)","450.231" "210.000","Ton","Superpave Intermediate Course - 12.5 Polymer (Sic -12.5 - P)","450.311" "160.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "10.000","Ton","Superpave Leveling Course - 9.5 (Slc - 9.5)","450.52" "8.000","Ton","Superpave Bridge Surface Course - 12.5 Polymer (Ssc-b - 12.5 - P)","450.611" "15.000","Ton","Superpave Bridge Protective Course – 12.5polymer (Spc-b - 12.5 - P)","450.711" "5.000","Ton","Hma for Patching","451." "293.000","Gal","Asphalt Emulsion for Tack Coat","452." "870.000","Ft","Hma Joint Sealant","453." "15.000","Ton","Temporary Asphalt Patching","472." "116.000","Ft","Granite Curb Type Va4 - Straight","504." "25.000","Ft","Granite Transition Curb for Pedestrian Curb Ramps - Straight","509." "225.000","Ft","Guardrail, Tl-2 (Single Faced)","620.12" "12.000","Ft","Guardrail - Curved, Tl-2 (Single Faced)","620.32" "1.000","Ea","Trailing Anchorage","627.1" "3.000","Ea","Guardrail Tangent End Treatment, Tl-2","627.82" "4.000","Ea","Transition to Bridge Rail","628.24" "170.000","Ft","Temporary Fence","657." "330.000","Ft","Temporary Fence Removed and Reset","657.5" "100.000","Ft","Fence Removed and Reset","670." "1.000","Ea","Silt Sack","697.1" "67.000","Sy","Geotextile Fabric for Permanent Erosion Control","698.4" "4.000","Ton","Hot Mix Asphalt Sidewalk or Driveway","702." "17.000","Mo","Engineers Field Office and Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "180.000","Cy","Loam Borrow","751." "1700.000","Sy","Compost Blanket","751.72" "460.000","Lb","Seed for Erosion Control","765.2" "10.000","Lb","Annual Cover Crop","765.21" "10.000","Lb","Mid-height Grassland Mix","765.421" "1.000","Lb","Wetland Mix - Facw Meadow Mix","765.551" "1280.000","Sy","Native Seeding and Establishment","765.635" "2560.000","Sy","Mowing for Native Seed Establishment","765.664" "1420.000","Ft","Sediment Control Barrier","767.121" "1660.000","Sy","Straw Mulch","767.31" "1320.000","Sy","Jute Mesh","767.9" "360.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "430.000","Ft","Pavement Milling Mulch for Shoulders","769.1" "3.000","Ea","Pine - White 3-4 Feet","773.014" "6.000","Ea","Maple - Red 5-6 Feet","776.522" "5.000","Ea","Birch - Gray 5-6 Feet","778.114" "5.000","Ea","Birch - Yellow 5-6 Feet","778.25" "6.000","Ea","Birch - Cherry 5-6 Feet","778.255" "5.000","Ea","Serviceberry - Shadblow Clump 4-5 Foot","783.039" "12.000","Ea","Black Chokeberry 2-2.5 Feet","789.735" "14.000","Ea","Dogwood - Gray 2-2.5 Feet","790.532" "10.000","Ea","Dogwood - Redosier 2-3 Feet","790.633" "15.000","Ea","Viburnum - Arrowwood 2-2.5 Feet","795.000" "9.000","Ea","Willow - Pussy 2-2.5 Feet","795.432" "1.000","Ls","Temporary Traffic Control Signal","816.81" "20.000","Sf","Warning-regulatory and Route Marker - Aluminum Panel (Type a)","832." "4.000","Ea","Delineation for Guard Rail Termini","833.7" "4.000","Ea","Sign Sup (N/guide)+rte Mkr W/1 Brkway Post Assembly - Steel","847.1" "480.000","Hr","Roadway Flagger","850.41" "140.000","Sf","Safety Signing for Traffic Management","852." "4.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "170.000","Ft","Temporary Barrier (Tl-2)","853.2" "490.000","Ft","Temporary Barrier - Limited Deflection (Tl-2)","853.32" "6.000","Ea","Temporary Impact Attenuator Bi-directional, Redirective (Tl-2)","853.82" "9400.000","Day","Reflectorized Drum","859." "30.000","Ft","12 Inch Reflectorized White Line (Painted)","860.112" "3.000","Ea","Sign Post Removed and Discarded","877.1" "35.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete","901." "28.000","Cy","4000 Psi, 3/4 Inch, 610 Cement Concrete","904." "5.000","Cy","4000 Psi, 3/8 Inch, 660 Cement Concrete","905." "7530.000","Lb","Steel Reinforcement for Structures - Epoxy Coated","910.1" "60.000","Ea","Coring and Grouting #4 Dowels","913.34" "100.000","Ea","Coring and Grouting #6 Dowels","913.36" "30.000","Cy","Riprap (Partially Grouted)","983.211" "1.000","Ls","Streambed Restoration","983.522" "1.000","Ls","Control of Water - Structure No. S-06-003","991.1" "1.000","Ls","Temporary Bridge No. S-06-003","993.1" "720.000","Sf","Temporary Protective Shielding","994.1" "1.000","Ls","Bridge Superstructure, Bridge No.s-06-003","995." |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |