Similar Projects
Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Bridge Superstructure Repairs and Related Work at Two Locations
Results
Less than $1,232,678 est. value

Bridge Replacement BR No T-10-007 Monterey Road Over Hop Brook
Results
Less than $1,531,866 est. value
Tyringham, MA 01264

Averic Road East Bridge Replacement and Related Work
Results
Less than $700,000 est. value
Stockbridge, MA 01262

Bridge Superstructure Replacement BR No N-08-006 Campbell Falls Road Over the Whiting River
Results
Less than $772,027 est. value
New Marlborough, MA 01230

Bridge Replacement and Related Work BR No W-37-015 (Next F Beams) Route 2 (Main Street) Over the Green River
Results
Less than $4,849,979 est. value
Williamstown, MA 01267

Scheduled and Emergency Bridge Superstructure Repairs and Related Work at Various Locations
Results
Less than $747,769 est. value

Bridge Deck Repairs And Related Work Br. No. N-14-017 Route 2 Over The Hoosic River
Results
Less than $598,960 est. value
North Adams, MA

Scheduled and Emergency Bridge Substructure Repairs at Various Locations
Results
Less than $388,700 est. value

Replacement of Bridge at Interlaken Road Over Larrywaug Brook
Results
$1,320,537 est. value
Stockbridge, MA

Dublin Road Bridge Replacement
Results
$400,000 est. value
Richmond, MA

Bridge Superstructure Replacement and Related Work
New Construction, Infrastructure
Results
$3,581,640 est. value
New Marlborough, MA

Scheduled and Emergency Bridge Deck and Joint Repairs at Various Locations
New Construction, Infrastructure
Results
$1,361,187 est. value

Bridge Superstructure Replacement and Related Work BR No L-07-006 (Steel) Roaring Brook Road over Roaring Brook
New Construction, Infrastructure
Results
$1,084,395 est. value
Lenox, MA 01240

Bridge Replacement Br. No. P-10-034 (Steel) Mill Street Over the West Branch of Housatonic River
New Construction, Infrastructure
Results
$2,999,620 est. value
Pittsfield, MA

Last Updated 12/15/2021 10:16 AM
Project Title

Bridge Superstructure Replacement and Related Work BR No. S-06-003 (Pre-Stressed Concrete Deck Beams) Center Road over Center Brook

Physical Address View project details and contacts
City, State (County) Savoy, MA 01256   (Berkshire County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,675,513
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule of Operations - Fixed Price $8,500","100." "0.400","a","Clearing and Grubbing","101." "6.000","Hr","Herbicide Treatment for Invasive Plants","102.3" "6.000","Hr","Invasive Plant Management Strategy","102.33" "1.000","Ls","Demolition of Superstructure of Bridge No. S-06-003","114.1" "950.000","Cy","Unclassified Excavation","120.1" "23.000","Cy","Reinforced Concrete Excavation","127.1" "40.000","Cy","Class a Trench Excavation","141." "10.000","Cy","Test Pit for Exploration","141.1" "278.000","Cy","Channel Excavation","143." "25.000","Cy","Class B Rock Excavation","144." "170.000","Cy","Ordinary Borrow","150." "510.000","Cy","Special Borrow","150.1" "700.000","Cy","Gravel Borrow","151." "62.000","Cy","Gravel Borrow - Type C","151.01" "30.000","Cy","Gravel Borrow for Backfilling Structures and Pipes","151.2" "22.000","Ton","Crushed Stone","156." "1780.000","Sy","Fine Grading and Compacting - Subgrade Area","170." "1.000","Ea","Catch Basin","201." "1.000","Ea","Frame and Grate - Massdot Cascade Type","222.1" "4.000","Ft","12 Inch Drainage Pipe - Option","234.12" "191.000","Sf","Granite Stone Waterway","281.6" "90.000","Cy","Dense Graded Crushed Stone for Sub-base","402." "590.000","Sy","Pavement Fine Milling","415.2" "2670.000","Lb","Calcium Chloride for Roadway Dust Control","440." "8.000","Mgl","Water for Roadway Dust Control","443." "140.000","Ton","Superpave Surface Course - 12.5 Polymer (Ssc - 12.5 - P)","450.231" "210.000","Ton","Superpave Intermediate Course - 12.5 Polymer (Sic -12.5 - P)","450.311" "160.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "10.000","Ton","Superpave Leveling Course - 9.5 (Slc - 9.5)","450.52" "8.000","Ton","Superpave Bridge Surface Course - 12.5 Polymer (Ssc-b - 12.5 - P)","450.611" "15.000","Ton","Superpave Bridge Protective Course – 12.5polymer (Spc-b - 12.5 - P)","450.711" "5.000","Ton","Hma for Patching","451." "293.000","Gal","Asphalt Emulsion for Tack Coat","452." "870.000","Ft","Hma Joint Sealant","453." "15.000","Ton","Temporary Asphalt Patching","472." "116.000","Ft","Granite Curb Type Va4 - Straight","504." "25.000","Ft","Granite Transition Curb for Pedestrian Curb Ramps - Straight","509." "225.000","Ft","Guardrail, Tl-2 (Single Faced)","620.12" "12.000","Ft","Guardrail - Curved, Tl-2 (Single Faced)","620.32" "1.000","Ea","Trailing Anchorage","627.1" "3.000","Ea","Guardrail Tangent End Treatment, Tl-2","627.82" "4.000","Ea","Transition to Bridge Rail","628.24" "170.000","Ft","Temporary Fence","657." "330.000","Ft","Temporary Fence Removed and Reset","657.5" "100.000","Ft","Fence Removed and Reset","670." "1.000","Ea","Silt Sack","697.1" "67.000","Sy","Geotextile Fabric for Permanent Erosion Control","698.4" "4.000","Ton","Hot Mix Asphalt Sidewalk or Driveway","702." "17.000","Mo","Engineers Field Office and Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "180.000","Cy","Loam Borrow","751." "1700.000","Sy","Compost Blanket","751.72" "460.000","Lb","Seed for Erosion Control","765.2" "10.000","Lb","Annual Cover Crop","765.21" "10.000","Lb","Mid-height Grassland Mix","765.421" "1.000","Lb","Wetland Mix - Facw Meadow Mix","765.551" "1280.000","Sy","Native Seeding and Establishment","765.635" "2560.000","Sy","Mowing for Native Seed Establishment","765.664" "1420.000","Ft","Sediment Control Barrier","767.121" "1660.000","Sy","Straw Mulch","767.31" "1320.000","Sy","Jute Mesh","767.9" "360.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "430.000","Ft","Pavement Milling Mulch for Shoulders","769.1" "3.000","Ea","Pine - White 3-4 Feet","773.014" "6.000","Ea","Maple - Red 5-6 Feet","776.522" "5.000","Ea","Birch - Gray 5-6 Feet","778.114" "5.000","Ea","Birch - Yellow 5-6 Feet","778.25" "6.000","Ea","Birch - Cherry 5-6 Feet","778.255" "5.000","Ea","Serviceberry - Shadblow Clump 4-5 Foot","783.039" "12.000","Ea","Black Chokeberry 2-2.5 Feet","789.735" "14.000","Ea","Dogwood - Gray 2-2.5 Feet","790.532" "10.000","Ea","Dogwood - Redosier 2-3 Feet","790.633" "15.000","Ea","Viburnum - Arrowwood 2-2.5 Feet","795.000" "9.000","Ea","Willow - Pussy 2-2.5 Feet","795.432" "1.000","Ls","Temporary Traffic Control Signal","816.81" "20.000","Sf","Warning-regulatory and Route Marker - Aluminum Panel (Type a)","832." "4.000","Ea","Delineation for Guard Rail Termini","833.7" "4.000","Ea","Sign Sup (N/guide)+rte Mkr W/1 Brkway Post Assembly - Steel","847.1" "480.000","Hr","Roadway Flagger","850.41" "140.000","Sf","Safety Signing for Traffic Management","852." "4.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "170.000","Ft","Temporary Barrier (Tl-2)","853.2" "490.000","Ft","Temporary Barrier - Limited Deflection (Tl-2)","853.32" "6.000","Ea","Temporary Impact Attenuator Bi-directional, Redirective (Tl-2)","853.82" "9400.000","Day","Reflectorized Drum","859." "30.000","Ft","12 Inch Reflectorized White Line (Painted)","860.112" "3.000","Ea","Sign Post Removed and Discarded","877.1" "35.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete","901." "28.000","Cy","4000 Psi, 3/4 Inch, 610 Cement Concrete","904." "5.000","Cy","4000 Psi, 3/8 Inch, 660 Cement Concrete","905." "7530.000","Lb","Steel Reinforcement for Structures - Epoxy Coated","910.1" "60.000","Ea","Coring and Grouting #4 Dowels","913.34" "100.000","Ea","Coring and Grouting #6 Dowels","913.36" "30.000","Cy","Riprap (Partially Grouted)","983.211" "1.000","Ls","Streambed Restoration","983.522" "1.000","Ls","Control of Water - Structure No. S-06-003","991.1" "1.000","Ls","Temporary Bridge No. S-06-003","993.1" "720.000","Sf","Temporary Protective Shielding","994.1" "1.000","Ls","Bridge Superstructure, Bridge No.s-06-003","995."

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents