Similar Projects
Warehouse Material Handling Equipment for Student Nutrition Services (SNS)
Term Contract
Sub-Bidding
Garland, TX 75040

Electronic Locking System
Term Contract
Sub-Bidding
Grand Prairie, TX 75050

Modification Rail Wash Bay
Alteration
Post-Bid
$450,000 est. value
Dallas, TX

Purchase of Compressors
Alteration
Post-Bid
Carrollton, TX 75006

North Mesquite High School Rational Combi Oven and Installation
Alteration
Results
$200,000 est. value
Mesquite, TX 75150

West Mesquite High School Dishwasher Flight 1 Type and Installation
Alteration
Results
$172,000 est. value
Mesquite, TX 75149

Warehouse Equipment Maintenance/Service
Term Contract
Post-Bid
Dallas, TX

Wilkinson Middle School Rational Combi Oven and Installation
Alteration
Results
$89,000 est. value
Mesquite, TX 75149

Purchase of Plumbing Equipment
Alteration
Post-Bid
Dallas, TX 75215

Traffic Signal Equipment
Infrastructure
Results
$48,333 CJ est. value
Carrollton, TX 75006

Composite Manhole Lids
Alteration
Post-Bid
Irving, TX

Water Treatment Rental Equipment and Maintenance Services
Term Contract
Post-Bid
Garland, TX 75040

Dallas Airport System Elevator Upgrades Phase II
Renovation
Post-Bid
$200,000 CJ est. value
Dallas, TX 75235

ORG 216 Edward Titche ES-Renovation - Completed CSP Package Part 2
Renovation
Post-Bid
Dallas, TX 75227

ORG 216 Edward Titche ES-Renovation - Completed CSP Package Part 1-A, 1-B and 1-C
Renovation
Post-Bid
$1,318,882 CJ est. value
Dallas, TX 75227

Last Updated 10/05/2023 09:14 AM
Project Title

SCRO-Replace Boilers Building 346

Physical Address View project details and contacts
City, State (County) Grand Prairie, TX 75051   (Dallas County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $110,356 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Sol : 15B50023P00000029 The Federal Bureau of Prisons (FBOP),South Central Regional Office hereby issues solicitation 115B50023Q00000004 for the of a firm-fixed-price contract to a responsible entity that will provide turnkey installation including all necessary equipment, labor, materials, and incidentals to remove existing boilers and installation of gas boilers system. All equipment specified in this statement must be brand name or an equal product. Should your firm choose to submit an equal product, you must submit all technical specification of the equal product to be analyzed and a technical issued with acceptance/non-acceptance. Replace Gas Boilers This project basis of is Raypak MVB - Type H Heating Boiler Models 503A-2003A with a period of of 80 calendar . Contractor shall remove two existing boilers, pumps, controls and associated hardware. Supply and installation of (2) new Raypak MVB - Type H Heating Boiler Models 503A-2003A or equivalent. Contractor shall re pipe boiler room to Raypak piping diagram. All flanges shall be heavy duty 150lb companion with grade 8 bolts. All water piping shall be 3" copper, commercial type L hard drawn. Includes secondary boiler loop, sensor well, check valves and associated pipe fittings. Contractor shall also provide and install new boiler pumps specified for the boilers. Installation shall include new full port ball valves on both inlet and outlet of each boiler. Work shall also include thermostatic mixing valves on both boilers to prevent condensate from forming. Contractor shall also re pipe gas as needed for new boilers. Full port ball valves and accessible sediment traps shall be provided and installed. All piping and boiler installation shall meet international plumbing and mechanical codes. Venting Contractor shall provide and install new 14" B Vent with fan on roof with rain cap and collar. Fan shall be interlocked to boilers as to prevent any collection of fuel in the vent stacks. Installation includes all vent, US Draft fan sized specifically for the room and boiler system. Includes all control wiring and electrical wiring for fan system. Includes retrofitting combustion air inlet to boilers. Insulation Contractor shall provide and install new fiberglass insulation on all hydronic piping from existing primary loop to boilers. Includes all insultation from existing loop tie on point to boilers. Insulation shall meet all state, federal and local energy codes. Carbon Monoxide Control Module Contractor shall provide and install Carbon Monoxide control module with calibrated CO sensor. Dual relays interlocked to boiler. If carbon monoxide is detected at or above 50ppm co module shall immediately shutdown both boilers to prevent life, health and safety issues. Manual reset (push button to enable) auto reset shall be included. Installation shall include all electrical and control wiring. Isolation transformer shall also be included. The North American Industrial Classification System (NAICS) code applicable to this requirement is 238220 (Plumbing, Heating and Air-Conditioning Contractors) with a corresponding small business size standard of $19.0. Any secured/locked documents with the solicitation will require an active vendor registration at https://SAM.gov as well as your Marketing Partner Identification Number (MPIN) associated with your System for Management (SAM) registration. If you encounter problems accessing these documents, please contact the Federal Service Desk at 866-606-8220. The solicitation will be distributed solely through the SAM database at https://SAM.gov. Hard copies of the solicitation will not be made . The website provides download instructions. All future information about this solicitation, including any amendments, will also be distributed solely through this website. Interested parties are responsible for continuously monitoring this website to ensure that they have the most recent information about this proposed contract action. IMPORTANT: Any contractor interested in obtaining a contract with the Federal Bureau of Prisons must be registered in the System for Management (SAM) at SAM.gov. All bidders are urged to double check their SAM registration and update as necessary, including the size metrics information. This solicitation is intended only for those who would be entering into a Prime contract with the FBOP for the entirety of this project. The FBOP does not subcontracts. Subcontracts (if applicable/necessary) are the responsibility of the Prime contractor. The FBOP has no privity of the contract with subcontractors. IMPORTANT: Any contractor interested in obtaining a contract with the Federal Bureau of Prisons must be registered in the System for Management (SAM) at https://SAM.gov. If you have questions about SAM.gov, Government procurements in general, or need assistance in the preparation of your /proposal/offer, a local Procurement Technical Assistance Center (PTAC) may be able to help. The Procurement Technical Assistance Program was authorized by Congress in 1985 in an effort to expand the number of businesses capable of participating in the Government marketplace. To locate a PTAC near you, go to http://www.aptac-us.org. Any questions relating to the solicitation before the closing date shall be sent to Abigail Arriaga, Contract Specialist, via at Replace Gas Boilers This project basis of is Raypak MVB - Type H Heating Boiler Models 503A-2003A with a period of of 80 calendar . Contractor shall remove two existing boilers, pumps, controls and associated hardware. Supply and installation of (2) new Raypak MVB - Type H Heating Boiler Models 503A-2003A or equivalent. Contractor shall re pipe boiler room to Raypak piping diagram. All flanges shall be heavy duty 150lb companion with grade 8 bolts. All water piping shall be 3" copper, commercial type L hard drawn. Includes secondary boiler loop, sensor well, check valves and associated pipe fittings. Contractor shall also provide and install new boiler pumps specified for the boilers. Installation shall include new full port ball valves on both inlet and outlet of each boiler. Work shall also include thermostatic mixing valves on both boilers to prevent condensate from forming. Contractor shall also re pipe gas as needed for new boilers. Full port ball valves and accessible sediment traps shall be provided and installed. All piping and boiler installation shall meet international plumbing and mechanical codes. Venting Contractor shall provide and install new 14" B Vent with fan on roof with rain cap and collar. Fan shall be interlocked to boilers as to prevent any collection of fuel in the vent stacks. Installation includes all vent, US Draft fan sized specifically for the room and boiler system. Includes all control wiring and electrical wiring for fan system. Includes retrofitting combustion air inlet to boilers. Insulation Contractor shall provide and install new fiberglass insulation on all hydronic piping from existing primary loop to boilers. Includes all insultation from existing loop tie on point to boilers. Insulation shall meet all state, federal and local energy codes. Carbon Monoxide Control Module Contractor shall provide and install Carbon Monoxide control module with calibrated CO sensor. Dual relays interlocked to boiler. If carbon monoxide is detected at or above 50ppm co module shall immediately shutdown both boilers to prevent life, health and safety issues. Manual reset (push button to enable) auto reset shall be included. Installation shall include all electrical and control wiring. Isolation transformer shall also be included. Start Up Contractor shall provide a full manufactures startup. Warranty Shall include factory warranty on all equipment: Ten years for Heat Exchanger and 1 year on all other parts and labor.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents