Similar Projects
Wolf Point Phase 1B Wastewater CIPP REhabilitation
Infrastructure
Bidding
$550,000 est. value
Wolf Point, MT

Wastewater-Phase 1A Sewer Replacement
Infrastructure
Bidding
$800,000 est. value
Wolf Point, MT

Removing and Replacing 9 Sewer Manholes
Infrastructure
Post-Bid
Helena, MT

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Construction of Park Avenue Sewer Main Extension
Infrastructure
Results
Stevensville, MT

Phase Two Sanitary Sewer Interceptor Replacement
Infrastructure
Results
Billings, MT

1st Ave Alley EN Sanitary Sewer Replacement
Infrastructure
Bidding
$420,000 est. value
Kalispell, MT 59901

Schedules 1-4, Water and Sewer Main Replacement
Infrastructure
Post-Bid
Billings, MT

Lewis and Clark State Park Comfort Station Septic
Infrastructure
Results
$466,000 est. value
Whitehall, MT

Construction of the Wolf Point Phase One Wastewater
Infrastructure
Bidding
$200,000 est. value
Wolf Point, MT

ADLC Daly Addition Road Improvements Project
Alteration
Post-Bid
Anaconda, MT

New Water and Sewer Main, Street Reconstruction
Infrastructure
Results
$619,326 est. value
East Helena, Helena, MT 59601

Phase 1 Collection System Rehabilitation
Infrastructure
Bidding
$260,000 est. value
Glendive, MT 59330

Bannack and Clarkes Lookout State Park Septic and Vault Pumping
Term Contract
Post-Bid
Dillon, MT 59725

MLC Sewer and Water System Improvements
Infrastructure
Results
Helena, MT 59602

Reported 05/19/2022 12:00 AM
Project Title

Terminal Sanitary System Improvements at Glacier Park International Airport

Physical Address View project details and contacts
City, State (County) Kalispell, MT 59901   (Flathead County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work involved includes construction of a new wastewater pumping system, conveyance pipelines, truck filling station and lavatory waste facility. Wastewater will be conveyed to an existing permitted wastewater treatment facility. The majority of the pipelines will be trenched and backfilled; however, there will be directionally drilled sections of pipe under wetlands and stream channels.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents