Similar Projects
Header Repair/project is located on Route 11, Bridge 3555
New Construction
Bidding
Ashland, ME

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Post-Bid
$500,000,000 est. value
Kittery, ME

Preconstruction Services for the Camden Highway and Bridges Project
Post-Bid
Camden, ME 23023

Hampden Bridge Bundle/Design-Build - Design and Construction of Eight Replacement Bridges
Results
Less than $35,800,000 est. value
Hampden, ME

Torsey Pond Dam and Bridge Repairs at Torsey Pond on Old Kents Hill Road
Results
Readfield, ME 04355

Repair of Mitchell Bridge 2114
Post-Bid
Houlton, ME 04730

Transfer Bridge Repairs/Located at Peaks Island Ferry Terminal
Results
Less than $1,100,000 est. value
Peaks Island, ME 04108

Railroad Bridge Capacity
Post-Bid
Frenchville, ME 04745

Gilman Bridge Replacement/Located on Route 150/Harmony Road and Gilman Road Approximately 2.5 Miles North Easterly of Route 151 Junction
Results
Less than $3,400,000 est. value
Athens, ME 04912

Blue Hill, Falls Bridge No 5038 /Located On Route 175 Over Salt Pond Outlet
Post-Bid
Blue Hill, ME

Gloucester Hill Road Bridge Replacement
Results
New Gloucester, ME

Madawaska Bridge Construction Support Services
Post-Bid
ME

Kelly Road Bridge Deck Replacement/Located on Kelly Road over Interstate 95 Approximately 0.61 of a Mile Southeasterly of Stillwater Avenue
Results
Orono, ME 04469

Bridge Repairs - (3) Various Locations
Results
Less than $1,005,000 est. value
Sabattus, Saco, Scarborough, ME

Wagner Number Two Bridge Replacement
Results
Waldoboro, ME 04572

Last Updated 11/07/2019 01:22 PM
Project Title

T2 R9 Training Site Bridges

Physical Address View project details and contacts
City, State (County) Millinocket, ME   (Penobscot County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of bridge construction at water crossings designated A-13-01 and B-02-01 at the T2 R9 Training Site. Project consists of the demolition of a temporary wooden bridge structure at crossing A-13-01 and the failed culvert at crossing B-02-01 and their replacement with steel bridge structures constructed using "stream smart' requirements as directed by the Maine Department of Environmental Protection, the Army Corps of Engineers and the Department of US Fish and Wildlife. Project also consists of the construction of a 24 foot wide asphalt apron on each side of the respective bridges (approx. 110 linear feet) as well as 4000 linear feet of 24 ft. wide gravel roadway on each side of the bridges past the asphalt aprons.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents