Similar Projects
Last Updated | 09/09/2022 02:11 PM |
Project Title | 2.5 Chilled Water Valve and Actuator Replacement |
Physical Address | View project details and contacts |
City, State (County) | Maricopa, AZ 85138 (Pinal County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $25,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1.0 PROJECT TITLE: "Replace 2.5" Valve and Actuator" at the U.S. Arid Land Agricultural Research Center, Maricopa, Arizona." 2.0 GOVERNMENT POINTS OF CONTACT: 2.1 Contracting Officer (CO): Michael Sherlock 2.2 Contract Specialist (CS): Michael Sherlock 2.3 Facilities Operations Specialist (FOS)/ Contracting Officer's Representative (COR): Harry Gardner Facility Operations Specialist 21881 N. Cardon Lane Maricopa, AZ 85138 Tel. No.: 602-725-2123 harry.gardner@usda.gov 3.0 LOCATION: The site of work is located at the Agricultural Research Service, Arid Land Agricultural Research Center, 21881 N. Cardon Lane, Maricopa, AZ. 85138. 4.0 SITE VISIT: A site visit and inspection tour not required, but available. See Attachment 1 Terms and Conditions for more information. 5.0 BACKGROUND: ALARC is organized under the Agricultural Research Service (ARS) which is the principal research agency of the USDA and the Research, Education, and Economics (REE). The U.S. Arid-Land Agricultural Research Center (ALARC) integrates the former Western Cotton Research Laboratory and the U.S. Water Conservation Laboratory and is located on a 20-acre site at the University of Arizona, Maricopa Agricultural Center (MAC). The facility opened in February 2006. The location needs a Qualified Contractor to provide labor, supervision, equipment, and supplies/materials, except those furnished by the Government, necessary to Replace 2.5" Valve and Actuator as described in this SOW. The contractor shall maintain the current facility buildings, grounds and equipment to their most productive and efficient state of performance. 6.0 SCOPE OF SERVICE: The contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described herein. 7.0 PROJECT REQUIREMENTS: Contractor shall furnish a technical and unit priced (labor and materials) cost proposal to complete each project for any requested work as detailed in section 7.1 below. All requested work will be performed at the U.S. Arid Land Agricultural Research Center, Maricopa, Arizona. The contractor shall work with the site personnel to ensure project is accomplished in a timely manner. 7.1 Schedule: Provide qualified labor, supervision, equipment, and supplies/materials, necessary to Replace 2.5" Valve and Actuator. All work is to be completed during normal business hours (M-F - 7:00am-3:00pm) Schedule work with Facilities Department Period of Performance: 10/03/2022 to 12/05/2022 0001 2.5" Chilled Water Valve and Actuator Replacement 1 JC IAW the SOW and attachments. Product/Service Code: Z2JZ Product/Service Description: REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS Delivery: 90 Days After Notice to Proceed All work shall be done in accordance with (IAW) the terms and conditions, SOW, and other attachments set forth in the RFQ. IAW FAR 36.204, the estimated magnitude of the project is less than $25,000.00 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |