Similar Projects
Cline and Reiley Elementary Schools
New Construction, Renovation, Alteration
Conception
Alexandria, Cold Spring, KY 41076

CHFS Western State Hospital (WSH) - HVAC Piping Replacement
Renovation
Sub-Bidding
$318,900 CJ est. value
Hopkinsville, KY 42240

New Roof and Gutter for Hardin Caldwell - West
Renovation
Sub-Bidding
$348,444 CJ est. value
Elizabethtown, KY 42701

Center for Predictive Medicine HVAC Controls Modifications
Alteration
Post-Bid
Louisville, KY

HVAC Preventive Maintenance and Service
Term Contract
Post-Bid
KY

Cooling Tower Repair
Results
Louisville, KY 40202

Jeffersontown Library Attic Furnaces Units
Results
Jeffersontown, KY 40299

New Walk-in Freezer
Renovation
Sub-Bidding
$300,000 CJ est. value
Marion, KY 42064

Caverna Independent Schools Secure Entrance Improvements
Alteration
Post-Bid
Less than $200,000 est. value
Cave City, KY 42127

Anthropology Building - Collections Area HVAC Upgrades
Alteration
Results
$400,000 est. value
Lexington, KY 40504

Controls for Heating and A/C
Alteration
Post-Bid
KY

Estill County Courthouse- HVAC Repair and Controls Upgrade
Alteration
Results
Less than $735,000 est. value
Irvine, KY 40336

Water Source Heat Pumps
Term Contract
Post-Bid
Murray, KY 42071

BBSRB Penthouse JCI Devices Replacement
Renovation
Results
$100,000 est. value
Lexington, KY

HVAC Upgrades CM Letters of Interest
Alteration
Post-Bid
Harlan, KY

Last Updated 11/21/2022 10:03 AM
Project Title

Domestic Boiler Replacement

Physical Address View project details and contacts
City, State (County) Jackson, KY 41339   (Breathitt County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $189,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves replacing two natural gas domestic water boilers, two hot water storage tanks, expansion tanks, housekeeping pads, and two recirculation pumps. The new boilers will operate via their on-board controller (no BAS). A new water softener system is also included.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents