Similar Projects
Last Updated | 04/12/2022 11:52 AM |
Project Title | Primary Filtration Phase I |
Physical Address | View project details and contacts |
City, State (County) | Rockford, IL 61109 (Winnebago County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $19,523,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Comprised of all labor, materials, equipment, and supervision required to construct the following items: A. Primary Filtration Facility 1 which consists of: • Four (4) primary filtration influent pumps located in a wet well • Two (2) primary cloth media disk filter units, with backwash pumps, waste solids pumps, valving and piping • One (1) gravity thickener, with two (2) primary filtration thickened sludge pumps, • A scum pump wet well with one (1) scum pump • One (1) primary filter effluent flow split structure • All civil, structural and architectural, electrical, mechanical/HVAC, instrumentation and controls, and piping and valves for a complete, operable primary filtration system B. Modifications to Main Pump II Building which consists of: • New electrical room • HVAC removal and replacements for the entire building C. Modifications to piping and valves in the Primary Sludge Manhole and GBT Building basement D. Replacement of GBT 2 thickened sludge pump and discharge hopper, and appurtenances as indicated in the specifications E. Site work and yard piping improvements |
||||||||||||||||||||||||||||||||||||
Details | Sewage Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |