Similar Projects
Wastewater Treatment Plant Construction
New Construction
Design
Sterling, IL

Aerobic Digester Conversion
Renovation
Bidding
La Salle, IL 61301

Womens Locker Room Facilities
Renovation
Bidding
Highland Park, Waukegan, IL 60087

Wastewater Treatment Facility Controls Upgrade
Post-Bid
Davis Junction, IL

Sewage Treatment Plant
Post-Bid
Hudson, IL 61748

West Side Water Reclamation Facility 2020 Phase III Expansion
Results
$16,000,000 to $20,000,000 est. value
Saint Charles, IL 60175

Wastewater Treatment Plant Improvements WWTP #1 Phase D
Results
East Peoria, IL 61611

Replacement of the Existing Candle Stick Waste Gas Burner
Renovation
Bidding
$700,000 est. value
Libertyville, IL 60048

Bar Screen Replacement Project
Renovation
Post-Bid
Toluca, IL

Water System Disinfection Conversion
Results
Northbrook, IL 60062

Wastewater Treatment System Cell Liner Replacement
Renovation
Bidding
$700,000 est. value
Woodstock, IL

Wastewater Treatment Facility UV Disinfection
Infrastructure
Post-Bid
Metropolis, IL

Wastewater Treatment Facility Improvements
Results
Less than $7,120,000 est. value
Stockton, IL

Electric Motor Rehabilitation
Renovation
Post-Bid
$380,000 est. value
Chicago, IL

Installation of Disc Filters and Other Improvements at The Hanover Park Water Reclamation Plant
Results
Less than $3,600,000 est. value
Chicago, IL

Last Updated 04/12/2022 11:52 AM
Project Title

Primary Filtration Phase I

Physical Address View project details and contacts
City, State (County) Rockford, IL 61109   (Winnebago County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $19,523,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Comprised of all labor, materials, equipment, and supervision required to construct the following items: A. Primary Filtration Facility 1 which consists of: • Four (4) primary filtration influent pumps located in a wet well • Two (2) primary cloth media disk filter units, with backwash pumps, waste solids pumps, valving and piping • One (1) gravity thickener, with two (2) primary filtration thickened sludge pumps, • A scum pump wet well with one (1) scum pump • One (1) primary filter effluent flow split structure • All civil, structural and architectural, electrical, mechanical/HVAC, instrumentation and controls, and piping and valves for a complete, operable primary filtration system B. Modifications to Main Pump II Building which consists of: • New electrical room • HVAC removal and replacements for the entire building C. Modifications to piping and valves in the Primary Sludge Manhole and GBT Building basement D. Replacement of GBT 2 thickened sludge pump and discharge hopper, and appurtenances as indicated in the specifications E. Site work and yard piping improvements

Details

Sewage Treatment Plant, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 40 - Process Integration.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment.
Division 44 - Pollution and Waste Control Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents