Similar Projects
South Shore Water Reclamation Facility, Spare & Grit Pump #4 Replacements
Renovation
Bidding
Oak Creek, WI

Bldg. 203 W5 Tank Replacement
Addition
Post-Bid
Milwaukee, WI 53207

Three Gate Cylinder Replacements
Post-Bid
Wauwatosa, WI 53226

Cathodic Protection System Replacement Interplant Sludge System Improvements
Results
Milwaukee, WI

Front Secondary Clarifier Improvements at South Shore Water Reclamation Facility
Results
Milwaukee, WI

Bldg 203 Flap Gate Valve Replacements
Post-Bid
Milwaukee, WI 53207

Waste Activated Sludge Pump Replacements
Renovation
Results
Oak Creek, WI

Motor Control Center
New Construction
Post-Bid
Milwaukee, WI

Smoke Stack Door & Equalization & Blending
Renovation
Results
Milwaukee, WI 53207

IPS Pump 3-2 Repairs
Renovation, Alteration
Post-Bid
Milwaukee, WI 53207

PLC5 Upgrade in Dewatering & Drying Facility
Renovation
Results
Milwaukee, WI

Building 206 Primary Clarifier #3 Turntable
Renovation, Alteration
Post-Bid
Milwaukee, WI 53207

Building 258 Conveyor Repairs - Water Reclamation Facility
Renovation, Alteration
Results
Milwaukee, WI 53207

Reclamation Facility Service Water Pump #3 Motor Replacement
Renovation, Alteration
Post-Bid
Milwaukee, WI 53207

Jones Island Water Reclamation Facilitiy
Renovation
Results
Milwaukee, WI 53207

Last Updated 09/17/2021 02:27 PM
Project Title

Stop Logs for the South Shore Water Reclamation Facility

Physical Address View project details and contacts
City, State (County) Milwaukee, WI   (Milwaukee County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project contemplated consists of fabricating and furnishing a new inventory of stainless steel stop logs for South Shore Water reclamation Facility. This new inventory will replace the stop logs that have been discarded over the past decades due to degradation and failure, and enable plant operations to dewater various locations to perform in-channel work or isolate process channels to reduce the scale of outages necessary for construction projects. New stop logs shall be retrofitted to existing grooves at locations including the plant headworks, effluent pump station, vault AA, and the secondary clarifiers blending channel.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents