Similar Projects
Reported | 10/22/2021 12:00 AM |
Project Title | FY22 Mobile District`s Dredging Requirements |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: AL |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dredging |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Three requirements will be for hydraulic, cutterhead dredges. Required minimum pump discharge diameters will be between 24 and 30 inches measured as the inside diameter of the discharge side of the main dredge pump with minimum horsepower applied to the main pump of 2400/5000 respectively. A fourth requirement will be for trailing suction hopper dredges with a minimum hopper capacity of 3600 cubic yards. All the above requirements must be complete with crew, management staff and support equipment including pipelines, booster pumps, tugs, various other floating plants as would normally be expected to support a large dredging operation. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |