Similar Projects
North Overland Trail ADA
Infrastructure
Bidding
Fort Collins, CO 80521

Pressure Washing for Downtown Area 2021
Post-Bid
Fort Collins, CO 80524

Berthoud Trail Gap Project
Infrastructure
Post-Bid
Berthoud, CO

North Wilson Avenue Sidewalk and Connecting Pathways to Ponderosa Safe Routes to School
Results
Less than $535,895 est. value
Loveland, CO 80537

Construction Manager / General Contractor Services for Bicycle and Pedestrain Infrastructure Improvements
Results
Fort Collins, CO 80522

Kinston Millennium East 14th Subdivision Public Infrastructure project
Infrastructure
Post-Bid
Loveland, CO

Copper Ridge Connector Trail
Results
Loveland, CO

Kinston Millennium East 15th and 16th Subdivision
Infrastructure
Post-Bid
Loveland, CO

Carlisle and Wilson Avenue Sidewalk
Results
$100,000 to $130,000 est. value
Loveland, CO 80537

Safe Water Action Program General Contractor
Infrastructure
Post-Bid
Fort Collins, CO

Adult Activity Center Parking Lot Improvements
Results
Fort Collins, CO 80522

LC Parking Lot Maintenance
Infrastructure
Post-Bid
Fort Collins, CO 80526

Berthoud Safe Routes Sidewalk Project
Results
Berthoud, CO

ADA Ramps Improvements
Results
Less than $1,000,000 est. value
CO

Parking Lot Repairs
Term Contract
Results
Fort Collins, CO

Last Updated 03/17/2022 06:40 AM
Project Title

ADA Improvements

Physical Address View project details and contacts
City, State (County) Fort Collins, CO 80521   (Larimer County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $230,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The ADA Improvement project includes upgrades to sidewalk infrastructure primarily located in the northeast portion of CSU Main Campus and adjacent to the Oval, including ramps, sidewalks, paths and building access points. The scope of work includes fifteen (15) prioritized areas to address ADA deficiencies The work includes concrete curb and gutter, ramp and sidewalk modifications and replacement as well as incidental landscaping, irrigation and tree replacement.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents