Similar Projects
SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

I-10 Rest Area Reconstruction
Results

CR 315 C Shoulder Improvements and Paving
Results
$2,000,000 to $2,400,000 est. value
Green Cove Springs, FL 32043

Resurfacing/Drainage Improvements
Results
Less than $7,671,756 est. value

Claire Lane Underdrain and Roadway Improvements
Results
Less than $757,358 est. value
Orange Park, FL

Solomon Street Roadway Improvements and Bay Circle Underdrain and Roadway Improvements
Results
Less than $962,700 est. value
Orange Park, FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Reynolds Water System Improvements
Results
Less than $1,700,000 est. value
Green Cove Springs, FL 32043

Hot Plant-Mixed Bituminous Courses, Grading, Flexible Paving
Results

Horizontal Directional Drilling Services
Term Contract
Results
Less than $863,885 est. value
Middleburg, FL

Atlantis Drive Roadway Improvements - Phase I
Results
FL

Resurfacing
Results
Less than $3,952,767 est. value
FL

2019-2020 Roadway Improvements
Results
Less than $120,054 est. value
Keystone Heights, FL

Roadway Signing, Traffic Signal
Results
Less than $1,500,000 est. value

CR 218 - Cosmos Avenue to Pine Tree Lane Design Build
Results
FL

Last Updated 07/19/2021 10:16 AM
Project Title

Dolphin Street and Dolphin Court Utility Roadway Improvements

Physical Address View project details and contacts
City, State (County) Orange Park, FL 32073   (Clay County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,100,000 to $1,150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of approximately 2550 L.F. of Roadway, Curbing, Utility, and concrete work. The Project limits are on Dolphin Street, from the intersection with Gano Ave, then north along Dolphin Street, west across Bellair Blvd to end of the Culdesac on Dolphin Court. The major work elements include, but are not limited to, the following: Base Bid: a. Replace existing 4 6-inch (4" 6") water main with new PVC water main. b. Replace existing water services and meters with new water services and meters. c. Replace existing fire hydrants with new fire hydrants. d. Abandoned in place existing 4 6-inch (4" 6") water main by grout filling. e. Pavement removal and reconstruction. f. Remove existing and construct new curb and gutter. g. Remove and replace residential concrete driveway aprons in ROW and designated sidewalks. h. Adjust existing manhole ring and cover to new proposed grade elevations. Alternate Additive Bid #1: a. Remove and replace 186 LF existing underdrain at STA 12+90 to STA 14+75 only. Alternate Additive Bid #2: a. Remove 186 LF of existing underdrain at STA 12+90 to STA 14+75 as shown on plan sheet C-32. b. Construct 4,321 LF of new 6-inch (6") underdrain as shown on plan sheets C25-C34.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents