Similar Projects
HMA Resurfacing
Infrastructure
Bidding
Depue, IL

Various Highways throughout District 3
Infrastructure
Bidding

Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

2020 General Fund Street Program
Results
Less than $288,739 est. value
Princeton, IL 61356

2020 MFT Micro Surface
Results
Less than $111,791 est. value
Tiskilwa, IL 61368

CERL - Farber Drive Entrance Extension
Infrastructure
Post-Bid

2020 - Hot-Mix Asphalt Surface
Results
Ohio, IL 61349

Milo Township - HMA Patching and Resurfacing
Infrastructure
Post-Bid
IL

Resurfacing and Drainage Improvements
Results
Walnut, IL 61376

Intersections Improvements
Results

Resurfacing CH 19 from Angling Road to US 6
Results
IL

0.3 Miles North of East Walnut St
Results
Ladd, IL

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

Main Street Streetscape
Results
Sheffield, IL

Last Updated 10/04/2021 03:06 PM
Project Title

HMA Resurfacing

Physical Address View project details and contacts
City, State (County) Spring Valley, IL   (Bureau County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $435,470
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Hma Resurfacing Of Various Streets Within The City Of Spring Valley Including The Following: Hma Surf. Rem.; Cold Mill; 2" = 2587 Sy; Hma Surf. Rem.; Cold Mill; 2.5" = 5610 Sy; Hma Surf. Rem.; Butt Joints = 826 Sy; Class d Patch; 4" = 75 Sy; c&g Rem. & Repl. = 235 Lf; Pcc Swk; Rem & Repl.; 4"; Special = 1275 Sf; Hma Bind. Cse.; n50; Il 9.5fg = 1245 Ton; Hma Surf. Cse.; Mix c; n50; Il 9.5fg = 1481 Ton; Incidental Hma Surfacing = 307 Ton; Agg. Shldrs; Ca-6 Limestone = 464 Ton; Pipe Culvert Removal; 15" = 60 Lf; Pipe Culvert; Pvc (Sdr 26); 15" Special = 60 Lf; Ditch Shaping And Grading; Special = 60 Lf And Other Related Items. ** The City Of Spring Valley Has Adjusted The Pre-Qualification Limitations From 1,200 Tons To 3,500 Tons For #5 - Hma Paving.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents