Similar Projects
Construction of the Hurley Phase X (Hunts Fork Road) Waterline Extension
Infrastructure
Bidding
Vansant, VA

Morven Park Road Waterline Improvements Project
Infrastructure
Bidding
Leesburg, VA 20176

Construction of Columbus Loop Tanks Valve and Site Improvements Phase II
Post-Bid
Virginia Beach, VA 23462

Furnish and Delivery Ductile Iron 36" Class 52 Pipe
Term Contract
Post-Bid
Manassas, VA

Water Main Installation and Service Contract - Step II
Results
Less than $13,550,280 est. value
Fairfax, VA 22031

Leesburg Pike and South Van Dorn Street Water Main Replacements
Results
Fairfax, VA 22031

Fire Hydrant Replacement - Phase 6
Infrastructure
Bidding
Portsmouth, VA

On-Call Wet Utlities Services
Post-Bid
Alexandria, VA

Furnish and Deliver Fire Hydrants
Term Contract
Results
$238,651 est. value
Fairfax, VA 22031

Large Domestic and Fire Line Water Meters
Post-Bid
VA

Installation of New Water Facilities
Results
$5,000,000 to $8,000,000 est. value
Richmond, VA 23219

Maintenance Services for Water Filtration System
Post-Bid
Portsmouth, VA

Annual Services Contract 7 for Taps and Laterals Installation
Term Contract
Results
Less than $600,000 est. value
Virginia Beach, VA 23456

Job Order Contract (JOC) for On-Call Water and Sewer Maintenance, Repairs and Construction
Term Contract
Post-Bid
$1,000 to $500,000 est. value
VA

South Van Dorn Street Water Main Replacement
Results
Fairfax, VA 22031

Last Updated 08/23/2021 09:47 AM
Project Title

Roslyn Hill Drive Water Main Replacement

Physical Address View project details and contacts
City, State (County) Henrico, VA   (Henrico County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of providing approximately 1,105 linear feet of 6-inch ductile iron Class 52 water main along Roslyn Hills Drive; approximately 40 linear feet shall be installed by jack and bore method; approximately 1,065 linear feet of 6-inch water main shall be polyethylene wrapped; abandonment of approximately 1,105 linear feet of 3-inch water main; the installation of approximately 6 water services; the rehabilitation of 3 manholes; and providing site and pavement restoration and all other work as required by the Contract Documents in order to provide a complete system.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents