Similar Projects
Process Replacement and Redundancy Water Improvements - City of Wahpeton
Infrastructure
Conception
$10,434,473 CJ est. value
Wahpeton, ND 58075

Process Replacement and Redundancy Water Improvements - City of Wahpeton
Infrastructure
Conception
$10,434,473 CJ est. value
Wahpeton, ND 58075

Structure Replacement, Surfacing, and Incidentals
Demolition, New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Fairmount, ND 58030

Structure Replacement, Surfacing, and Incidentals
Demolition, New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Fairmount, ND 58030

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2018 Storm Sewer and Street Improvements Phase 1B
Results
$2,500,000 est. value
Wyndmere, ND

Cottonwood Court Reconstruction - 185 - Wahpeton
Infrastructure
Pending Verification
$313,996 CJ est. value
Wahpeton, ND 58075

Cottonwood Court Reconstruction - 185 - Wahpeton
Infrastructure
Pending Verification
$313,996 CJ est. value
Wahpeton, ND 58075

5th, 7th, & 8th St. S. and Fargo Ave. Reconstruct - 245 - City of Wahpeton
Infrastructure
Conception
$637,484 CJ est. value
Wahpeton, ND 58075

Concrete Pavement Repair
Infrastructure
Bidding
$800,000 CJ est. value
Wahpeton, ND 58075

Loy Avenue and 12th Street North
Infrastructure
Post-Bid
$2,762,300 est. value
Wahpeton, ND 58075

Woodland Drive Mill and Bituminous Overlay
Results
$500,000 est. value
Wahpeton, ND 58075

Highway 11/18 Improvements - North Dakota Department of Transportation
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Lidgerwood, ND 58053

Last Updated 11/04/2022 09:18 AM
Project Title

Westmore Addition Street Improvements - 465 - City of Wahpeton

Physical Address View project details and contacts
City, State (County) Wahpeton, ND 58075   (Richland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $635,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Street Improvements in the Westmore Addition including bituminous removal and patching, mill and overlay, reconstruct, sealcoat, curb and gutter replacement, and mudjacking. Reconstruct includes Avenue B from Valley Street to School Property approximately 150 lineal feet. Propose replacing shallow storm with valley gutter at Avenue B and Valley Street Intersection. Sewer and water should be replaced on this section as sewer is clay pipe and water is asbestos pipe. Reconstruct Western Road from Westmore Avenue approximately 450 lineal feet. Sewer and Water are both PVC in this stretch and could leave in place. Sewer should be televised prior to making final decision. Street reconstruct to include new curb and gutter, edge drains, geotextile fabric, 12 inches aggregate base and 5.5 inches bituminous pavement. Mill, patch, and overlay Westmore Avenue from 11th Street North to Western Road. Remaining streets in this subdivision will be seal coated. Consideration should be given to doing this project in conjunction with the Elm Court Improvements Project CIP number 432 The project is included in the city's 2023-2027 capital improvement plan (CIP). As of November 4, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents