Similar Projects
Blower Building 090 Blower - 23R04 - North Shore Water Reclamation District
Alteration
Conception
$1,409,400 est. value
Gurnee, IL

UV System Upgrade - Construction - 23R23 - North Shore Water Reclamation District
Alteration
Conception
$3,147,200 est. value
Gurnee, IL

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Asphalt Sealcoating and Repairs at Raw Water Pump Station, Elevated Tank and Booster Pump Station Facilities
Infrastructure
Design
$200,000 CJ est. value
Lake Bluff, IL 60044

RFQ Engineering - Phase III Construction Engineering Services for the Telegraph Road Improvement Project
Infrastructure
Bidding
$622,000 CJ est. value
Bannockburn, IL 60015

2021 Water Distribution Pressure Sensors
Post-Bid
Lake Forest, IL 60045

Forest Cove Sanitary Lift Station Replacement
Post-Bid
Waukegan, IL

Waveland Avenue Water Main and Storm Sewer Improvements
Results
$400,000 est. value
Gurnee, IL

Water and Sewer Interconnect Phase 1
Results
Fox Lake, IL

The Clove
New Construction, Infrastructure - 113,000 SF
Construction
$150,000,000 CJ est. value
Buffalo Grove, IL 60089

Peterson Road Mixed Use
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Libertyville, IL 60048

Courtland Commons
New Construction, Infrastructure
Pending Verification
$1,487,300 CJ est. value
Mundelein, IL 60060

PS1 24" Forcemain - Construction - 22A01 - North Shore Water Reclamation District
Infrastructure
Conception
$5,368,000 CJ est. value
Gurnee, IL 60031

St. James Fitness and Recreation Development
Demolition, New Construction, Infrastructure - 435,488 SF
Design
$75,000,000 CJ est. value
Lincolnshire, IL 60069

Illinois Beach State Park Shoreline Stabilization Design-Build Services
Post-Bid
$45,000,000 est. value
Zion, IL

Last Updated 11/29/2022 02:32 AM
Project Title

S4 Interceptor Sewer Improvements

Physical Address View project details and contacts
City, State (County) Beach Park, IL 60099   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,647,938 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Sheridan Road at Bull Creek in Beach Park. Approximately 800-feet South of Wadsworth Road. Bids will be received for the S4 Interceptor Sewer Improvements located at the Bull Creek crossing of Sheridan Road. The work generally consists of an interceptor reroute as a result of an IDOT culvert reconstruction project. A Bid shall be enclosed in an opaque sealed envelope clearly marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. All questions about the meaning or intent of the Bidding Documents are to be directed to the ENGINEER: HMG Engineers, Inc. - Christopher S. Bouchard, PE (847) 362-5959 DRAWINGS OF EXISTING STRUCTURES: Drawings of physical conditions in or relating to existing surface and subsurface structures used in preparing the Bidding Documents are on file at the North Shore Water Reclamation District, P.O. Box 750, 14770 W. Wm. Koepsel Drive, Gurnee, Illinois 60031, and may be examined by contacting the Director of Engineering Services at 847-623-6060. SUBSURFACE CONDITION REPORTS: Reports of explorations and tests of subsurface conditions used in preparing the Bidding Documents were obtained from IDOT's consultant for their culvert replacement project and are on file for inspection at all offices listed for inspecting Bidding Documents. Copies are available at no cost and may be obtained when requesting Bidding Documents. LEGAL PROVISIONS: CONTRACTORS and Subcontractors shall conform to the "Substance Abuse Prevention on Public Works Projects Act", (820 ILCS 265/1 et seq.); and with the provisions of 29 CFR Part 470. WAGE RATES: This Contract calls for the construction of a "public work," within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. ("the Act"). The Act requires CONTRACTORS and Subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the "prevailing rate of wages" (hourly cash wages plus fringe benefits) in the county where the work is performed. All CONTRACTORS and Subcontractors rendering services under this Contract must comply with all requirements of the Act, including but not limited to, all wage, notice and record keeping duties. BID SECURITY: Bid Security in the amount of not less than 5% of the Bid shall accompany each Bid in accordance with the Instructions to Bidders. CONTRACT SECURITY: The Bidder to whom a Contract is awarded shall furnish a Performance Bond and a Payment Bond each in an amount equal to the Contract Price. BID REJECTION/ACCEPTANCE: The OWNER reserves the right to reject any and all Bids, waive informalities in bidding, or to accept the Bid or Bids, which best serves the interests of the OWNER. BID WITHDRAWAL: No Bid shall be withdrawn for a period of 60 days after the scheduled opening of the bids without the consent of OWNER.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents