Installation of Pedestrian Signals and Construction of Concrete Curb Ramps on US221 / US321 (Blowing Rock Boulevard) from Deerfield Road to Boone Mall
Bidding
NC 28645

Installation of CIP Funded Traffic Signals (City Owned)
Post-Bid
Durham, NC

Traffic Signal Detection Equipment
Term Contract
Post-Bid
Less than $1,500,000 est. value
Charlotte, NC 28202

Vehicle Inductive Loops and/or Conduit Installation
Results
Salisbury, NC

Mast Arms at Warlick YMCA
Results
$171,550 est. value
Gastonia, NC 28053

Signal Fiber Construction
Post-Bid
Less than $390,000 est. value
Holly Springs, NC 27540

Installation of Inductive Loop Detectors
Results
Durham, NC

Traffic Control Devices
Post-Bid
Charlotte, NC

Signal Preemption for Emergency Vehicles
Results
Less than $413,937 est. value
Wilmington, NC

LED Signal Lamps
Post-Bid
Greensboro, NC

Progress Boulevard Signalization
Results
Less than $137,970 est. value
Siler City, NC 27344

Portable Traffic Signals Trailers
Term Contract
Post-Bid
Raleigh, NC

Installation of CIP Funded Signalized Pedestrian Crossing Improvements
Results
Less than $381,706 est. value
Durham, NC

Gold Line Phase 2 Traffic Signal Cabinets and Aps Parts
Post-Bid
Charlotte, NC

Downtown Pedestrian Signal Upgrade
Results
Concord, NC 28026

Last Updated 01/20/2021 04:54 AM
Project Title

Traffic Control on an “As Needed Basis”

Physical Address View project details and contacts
City, State (County) (Davidson, Davie, Forsyth, Rowan, Stokes Counties)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 SP 2 Lane, 2 Way Roadway, 1 Lane Closure, 8 hours or less, 1 mile or less 5 EA 2 SP Divided Multi-lane Roadway, Left or Right Lane Closure, 8 hours or less, 1 mile or less 25 EA 3 SP Divided Multi-lane Roadway, Right Lane Closure (including ramps and loops), 8 hours or less, 1 mile or less 20 EA 4 SP Divided Multi-lane Roadway, Closure of Left or Right 2 Lanes, 8 hours or less, 1 mile or less 15 EA 5 SP Divided Multi-lane Roadway, Closure of Right 2 Lanes (including ramps and loops), 8 hours or less, 1 mile or less 15 EA 6 SP Un-divided Multi-lane Roadway, Left or Right Lane Closure, 8 hours or less, 1 mile or less 5 EA 7 SP Un-divided Multi-lane Roadway, Right Lane Closure (including side streets), 8 hours or less, 1 mile or less 5 EA 8 SP Emergency Response 10 EA 9 SP Work Zone Traffic Control, each additional mile 10 EA 10 SP Work Zone Traffic Control, each additional hour 5 EA 11 SP Portable Changeable Message Sign”; The ‘On Site’ Delivery, Setup and Removal of a Portable Changeable Message Sign. The message sign shall be maintained by the contractor at all times, (unless stated by the Division Engineer). This message sign would be fully programmable and operational for our use, 24 hours or less 15 EA 12 862 Installation of Work Zone Signs per Standard 1101.01 20 EA 13 862 Provide 2 NCDOT certified flagging personnel, required signs, vehicles and cones for 2-lane, 2- way roadway – 1 lane closed (2 hour minimum) 40 HR 14 863 Provide 2 NCDOT certified flagging personnel, required signs, vehicles and cones for 2-lane, 2- way roadway – 1 lane and 2-way turn lane closed (2 hour minimum) 40 HR 15 863 Relocation and resetting of flagging operation (includes personnel, signs and traffic cones) 25 EA 16 863 Provide extra certified flagger 40 HR

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents