Similar Projects
Last Updated | 01/20/2021 04:54 AM |
Project Title | Traffic Control on an “As Needed Basis” |
Physical Address | View project details and contacts |
City, State (County) | (Davidson, Davie, Forsyth, Rowan, Stokes Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1 SP 2 Lane, 2 Way Roadway, 1 Lane Closure, 8 hours or less, 1 mile or less 5 EA 2 SP Divided Multi-lane Roadway, Left or Right Lane Closure, 8 hours or less, 1 mile or less 25 EA 3 SP Divided Multi-lane Roadway, Right Lane Closure (including ramps and loops), 8 hours or less, 1 mile or less 20 EA 4 SP Divided Multi-lane Roadway, Closure of Left or Right 2 Lanes, 8 hours or less, 1 mile or less 15 EA 5 SP Divided Multi-lane Roadway, Closure of Right 2 Lanes (including ramps and loops), 8 hours or less, 1 mile or less 15 EA 6 SP Un-divided Multi-lane Roadway, Left or Right Lane Closure, 8 hours or less, 1 mile or less 5 EA 7 SP Un-divided Multi-lane Roadway, Right Lane Closure (including side streets), 8 hours or less, 1 mile or less 5 EA 8 SP Emergency Response 10 EA 9 SP Work Zone Traffic Control, each additional mile 10 EA 10 SP Work Zone Traffic Control, each additional hour 5 EA 11 SP Portable Changeable Message Sign”; The ‘On Site’ Delivery, Setup and Removal of a Portable Changeable Message Sign. The message sign shall be maintained by the contractor at all times, (unless stated by the Division Engineer). This message sign would be fully programmable and operational for our use, 24 hours or less 15 EA 12 862 Installation of Work Zone Signs per Standard 1101.01 20 EA 13 862 Provide 2 NCDOT certified flagging personnel, required signs, vehicles and cones for 2-lane, 2- way roadway – 1 lane closed (2 hour minimum) 40 HR 14 863 Provide 2 NCDOT certified flagging personnel, required signs, vehicles and cones for 2-lane, 2- way roadway – 1 lane and 2-way turn lane closed (2 hour minimum) 40 HR 15 863 Relocation and resetting of flagging operation (includes personnel, signs and traffic cones) 25 EA 16 863 Provide extra certified flagger 40 HR |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |