Similar Projects
Bank Run Shell Base and Road Replacement
Infrastructure
Bidding
Cape Coral, FL

Improvements to Estero Boulevard Segment 5 and 6 Project
Post-Bid
Fort Myers, FL

First Street and Second Street Two Way Conversion
Post-Bid
Fort Myers, FL

I-75 at Colonial Boulevard Interchange
Results
FL

Town Maintained Road Resurfacing
Results
$126,680 to $130,000 est. value
Fort Myers Beach, FL 33931

2021 Street Resurfacing Project
Post-Bid
$650,000 est. value
Sanibel, FL

Lee Boulevard and Lee Street Intersection Improvements
Results
Fort Myers, FL 33901

Cape Coral Parkway Eastbound Turn Lane Extension at Del Prado
Infrastructure
Post-Bid
Cape Coral, FL 33909

Spot Paving FY2020 - Various Locations
Results
Cape Coral, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Gateway Boulevard and Commerce Lakes Drive Intersection Improvements
Results
Fort Myers, FL 33913

Lehigh Acres Resurfacing FY21B
Infrastructure
Post-Bid
FL

SR 739 (Metro Parkway) from Warehouse Road to Hanson Street FDOT Project
Results
Less than $1,349,491 est. value
Fort Myers, FL 33901

2020 Street Resurfacing Project
Results
Less than $600,000 est. value
Sanibel, FL 33957

Countywide Local Road Resurfacing FY 2020
Results
FL

Last Updated 08/16/2021 10:43 AM
Project Title

Nicholas Parkway (East) Improvements

Physical Address View project details and contacts
City, State (County) Cape Coral, FL 33904   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The replacement of an existing PVC water main with 16” ductile iron water main, installation of new drainage structures and associated piping, superelevation of portions of Nicholas Parkway East, and resurfacing within the project limits, which extends approximately one and two-tenths (1.2) miles from Santa Barbara Boulevard to Country Club Boulevard. The roadway portion of the project involves the construction of various median and roadway improvements to include, but not limited to, superelevation of noted sections of the roadway, pavement reconstruction, as needed, installing curb and gutter, traffic separators, and landscaping. The Work also includes the removal and replacement of noted driveways and sidewalks, construction of drainage infrastructure and swale work, placement of IT conduit and pull boxes, and the adjustment of existing utilities. The roadway portion of the project will also include the milling and resurfacing of Nicholas Parkway from Santa Barbara Blvd. to County Club Blvd. Along with the resurfacing the Work includes such items as replacement of existing striping, markings, signal loops, and RPM’s.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents