Similar Projects
Aluminum Arch Pipe
Infrastructure
Bidding

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Case Coal, Llc Bond Forfeiture
Alteration
Post-Bid
$110,000 to $180,000 est. value
Duffield, VA 24244

Reinforced Pre-Cast Concrete Pipe
Results
Midlothian, Richmond, VA 23224

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Pocoshock Stream Restoration
Results
VA

On-Call Emergency Soil Repair
Term Contract
Results

Culvert Restorations - VSBEP
Results
Less than $762,000 est. value

Richmond Office 10Th Street Retaining Wall and Water Infiltration Construction
Results
$100,000 to $250,000 est. value
Richmond, VA

On Call Pipe Rehab or Replacement
Results
Less than $2,019,000 est. value

On Call Pipe Rehab or Replacement
Results
Less than $4,457,000 est. value

Rattlesnake Creek Stream Restoration
Term Contract
Results
Richmond, VA

Drop Inlet and Pipe Cleaning
Term Contract
Results
Colonial Heights, Richmond, VA 23834

Aetna Willis Shaft Maintenance
Results
Midlothian, VA 23113

Almond Creek Interceptor Creek Crossing Replacement and Creek Stabilization
Results
Less than $3,500,000 est. value
Richmond, VA

Last Updated 08/25/2021 11:01 AM
Project Title

Otterdale Road Drainage Improvements Project

Physical Address View project details and contacts
City, State (County) VA   (Chesterfield County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $14,000,000 to $17,000,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvements include replacement of existing undersized drainage culverts and bridges with new single and multi-span bridges, improving existing horizontal curves, raising the associated road profile, improving the roadway shoulders and roadside ditches at each crossing, and drainage BMP facilities. The total combined Project length is approximately 1.0 miles.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents