Similar Projects
2021 Roadway Resurfacing
Bidding
Orange Beach, AL

Baldwin County Resurfacing Projects 2020: Group 2
Post-Bid
AL

Roadway Improvements
Post-Bid
$195,000 to $225,000 est. value
Elberta, AL 36530

Southern Region Disaster Recovery Support BPA
Results

Citywide Road Resurfacing and Striping Project
Results
Less than $406,226 est. value
Fairhope, AL 36533

FY 2020 Street Resurfacing
Post-Bid
Daphne, AL 36526

Provision of Labor and Equipment for Asphalt Placement
Results
Bay Minette, AL

Resurfacing of Various Roadways
Post-Bid
Elberta, AL 36530

Construction of Street Widening/Bike Lanes and Resurfacing
Results
Less than $653,441 est. value
Gulf Shores, AL 36547

Baldwin County Resurfacing Projects 2020: Group #1
Results
Bay Minette, AL 36507

ADA Transition Plan Improvements within Baldwin County Row Phase II
Results
Less than $178,831 est. value
Bay Minette, AL 36507

Constructing the Planing, Resurfacing, Steel Blockout Replacement, and Traffic Stripe
Results
$2,691,921 to $3,290,125 est. value
AL

Constructing the Safety Widening, Planing, Resurfacing, and Traffic Stripe on SR-181 from the Junction of SR-42 (US-98) West of Barnwell to just South of the Junction of Quail Creek Drive in Fairhope
Results
$1,486,034 to $1,816,264 est. value
AL

Bay Minette Transportation Facility Resurfacing and Parking Improvements
Results
Bay Minette, AL 36507

Constructing the Planing, Resurfacing, and Traffic Stripe on SR-3 (Us-31) from the Junction of Crosby Road in Bay Minette to the Escambia County Line
Results
$1,982,091 to $2,422,555 est. value
AL

Reported 06/26/2020 12:00 AM
Project Title

Resurfacing 2020

Physical Address View project details and contacts
City, State (County) Foley, AL   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of: Resurfacing, minor base repairs and minor drainage improvements for approximately 4.0 Miles of roadway; work includes approximately 4,450 Tons of Bituminous Concrete Wearing Layer and 603 Tons of Bituminous Concrete Binder/Patching Layer.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents