Similar Projects
Lincolns Challenge Academy-Rebid Boiler Repairs Admin Building -SE
Renovation
Sub-Bidding
$60,000 CJ est. value
Rantoul, IL 61866

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Results
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Des Plaines HVAC Improvements
Results
Des Plaines, IL

D1 HVAC Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Springfield, IL

Leal Elementary School Chiller Replacements
Results
$350,000 to $375,000 est. value
Urbana, IL 61801

Replacement Of Zoned Hvac System
Alteration
Post-Bid
Tinley Park, IL

Morton College Building E - HVAC
Renovation
Results
Less than $100,000 est. value
Cicero, IL 60804

HVAC Improvements at Madison School
Term Contract
Post-Bid
South Holland, IL 60473

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Replacement Arlington Heights Memorial Library
Results
Arlington Heights, IL

Hail Damaged HVAC Equipment Replacement
Infrastructure
Post-Bid
Urbana, IL 61802

Masonry Reconstruction - Ventilation
Results
Less than $100,000 est. value
Urbana, IL

Last Updated 10/14/2022 08:03 PM
Project Title

HVAC Upgrades - Central High School

Physical Address View project details and contacts
City, State (County) Clifton, IL 60927   (Iroquois County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $651,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

HVAC Upgrades Central High School, 1134 E. 3100 N. Road, Suite A, Clifton,, IL 60927 A. Supply all labor, transportation, apparatus, scaffolding and tools necessary for the completion of the Work; maintain and remove temporary equipment and construct in excellent and workmanlike manner the complete Work and everything properly incidental thereto, as stated in the Contract Documents or reasonably implied therefrom. It is not the intent of the Contract Documents to set forth in detail every item necessary for the construction of this Project. Contractor must be qualified forthis work and must, without direction, furnish and install everything necessary to provide construction complete and in acceptable order, ready for use without additional work. All parts must be coordinated, complete, ready to operate and delivered to Owner in new condition B. This Project is the HVAC Upgrades for Clifton C. U. S. D. No. 4 at the following schools: Central High School, 1134 East 3100 N. Road, Suite A Clifton, IL 60927 General Work (to include all work) Sealed proposals will be received by the Board of Education of Chebanse C. U. S. D. No.4 at the District Office, 203 N. Third, Ashkum, IL. Contractors intending on submitting a bid for the project are required to attend. 1.03 DOCUMENTS A. Forms: 1. The Bid Form used shall be that provided as a part of the Bid Documents. B. Classifications: 1. Bids shall be submitted according to the following classification: a.BASE BID 1: General Work (to include all work) C. Bond: 1. Each Bid must be accompanied by a Certified Check, Bid Bond, equal to 5% of the Bid, binding the Bidder to enter into contract. Bid Bonds must be from a surety approved by the owner and licensed in the State of Illinois. 2. Bid Bonds will not be returned, Certified Checks will be returned. D. Time: 1.No Bid shall be withdrawn for a period of thirty (30) days after the bid opening date without the consent of the Owner. 1.05 PERFORMANCE/ PAYMENT BOND A.The successful Bidder(s) shall provide a Performance and Payment Bond for the full amount of their Contract. See Section 00 42 15 Supplementary General Conditions. 1.06 GENERAL A. Wages: 1. The Wages of Employees on Public Works (Prevailing Wage Act), Illinois Revised Statutes, Chapter 48, Section 39s-1 et seq., shall apply in full to all portions of the work. B. Procedures: 1. The Owner reserves the right to reject any or all bids, and to waive informalities in bidding. Board of Education Chebanse C. U. S. D. No. 4 P. O. Box 158 203 N. Third St. Ashkum, IL 60911

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents