Similar Projects
City Hall Skylight Replacement - ADMIN-SKY - City of Newton
Infrastructure
Conception
$200,000 CJ est. value
Newton, IA 50208

Westwood Storage Shed - GOL-I-SHED - City of Newton
Infrastructure
Conception
$210,000 CJ est. value
Newton, IA 50208

2022 Alley Patching with HMA Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Newton, IA 50208

2022 Alley Patching with HMA Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Newton, IA 50208

PCC Pavement - Grade and Replace
Infrastructure
Results
IA

HMA Resurfacing with Milling
Infrastructure
Results
IA

Childrens Forest Sanitary Sewer Rehabilitation - WPC-I-Child - City Of Newton
Infrastructure
Conception
$1,100,000 CJ est. value
Newton, IA 50208

Construction of a New Baseball Field
Infrastructure
Post-Bid
$500,000 CJ est. value
Newton, IA 50208

HMA Resurfacing/Cold in-Place Recycling
Infrastructure
Results
IA

Splash Pad Construction - PAR-I-SPLASH - City Of Newton
Infrastructure
Conception
$625,000 CJ est. value
Newton, IA 50208

RFQ Construction Manager at Risk (CMAR) - Secondary Roads yard on Liberty Avenue
Infrastructure
Post-Bid
$500,000 CJ est. value
Newton, IA 50208

PCC Patching
Infrastructure
Results

Cardinal Pond Improvements - PAR-I-POND - City Of Newton
Infrastructure
Conception
$400,000 CJ est. value
Newton, IA 50208

Proposed Secondary Roads Liberty Avenue Yard Phase 1 Site Earthwork
Infrastructure
Post-Bid
$500,000 CJ est. value
Newton, IA 50208

Pavement Planing/Grooving
Infrastructure
Results
IA

Last Updated 04/05/2023 03:36 AM
Project Title

Jasper County Secondary Road Liberty Avenue Yard - Request for Subcontractor Statement of Qualifications

Physical Address View project details and contacts
City, State (County) Newton, IA 50208   (Jasper County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Project consistsof an 11,520-sf wood-framed pole building with metal siding roof, exterior walls, and interior liner panel; concrete paving; fuel dispensing system; and salt storage buildings. Concrete paving, asphalt paving, site fencing, CIPconcrete, pole building construction and interior wood framing, doors and hardware, overhead doors, painting, plumbing, HVAC, electrical, fuel dispensing system, salt storage buildings Stahl Construction is looking to prequalify subcontractors and material suppliers("Subcontractors") interested in bidding on thisconstruction management at-risk (CMAR) project. Any Subcontractor, to be considered for prequalification, must fill out and submit a Statement of Qualifications to our office by the date and time specified below. Prequalification criteria will include a company's experience, capability to perform, capacity to perform(personnel, financial, and otherwise), capability to insure and bond, safety record, and compliance with state and federal laws. Work expected to begin summer 2023 and finish late fall 2023.

Details

11,520 SF.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents