Last Updated | 08/17/2021 08:52 AM |
Project Title | Hemlock Street, Proctor Street and Bridle Path Pump Stations Replacement - General Bids |
Physical Address | View project details and contacts |
City, State (County) | Worcester, MA 01606 (Worcester County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,631,538 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | DCAMM Certificate. Work consists of the Replacement of three Pump Stations at Hemlock Street, Proctor Street and Bridle Path Pump Stations. (1) Hemlock Street Pump Station - a. Demolition existing pump station on Hemlock Street (above and below grade structures and all equipment) b. Sheeting/shoring c. Dewatering d. Site work, fencing and gates e. Underground precast concrete structures (wetwell and valve vault) f. Discharge piping and valves g. Above ground pad-mounted electrical enclosure h. Pad mounted diesel generator i. Two submersible wastewater pumps and controls j. Odor control unit k. PVC Sewer force main l. Instrumentation m. Variable frequency drives n. Lighting and power with new 3-phase electrical service o. Temporary sewer bypass (2) Proctor Street Pump Station – a. Selective demolition existing pump station on Proctor Street (above ground superstructure and all equipment, and selective demolition and re-use of the existing below grade concrete foundation) b. Sheeting/shoring c. Dewatering d. Site work, retaining wall, fencing and gates e. Underground precast concrete structures (wetwell and valve vault) f. Discharge piping and valves g. Above ground pad-mounted electrical enclosure h. Pad-mounted diesel generator i. Two submersible wastewater pumps and controls j. Odor control unit k. PVC Sewer force main l. Instrumentation m. Variable frequency drives n. Lighting and power with new 3-phase electrical service o. Temporary sewer bypass (3) Bridle Path Pump Station – a. Selective demolition existing pump station on Bridle Path (above ground superstructure and all equipment, and selective demolition and re-use of the existing concrete foundation) b. Sheeting/shoring c. Dewatering d. Site work, fencing and gates e. Precast concrete structure for wetwell, provided to re-purpose the existing foundation into a wetwell and valve vault f. Precast concrete slab g. Concrete fill h. Discharge piping and valves i. Above ground pad-mounted electrical enclosure j. Slab-mounted diesel generator k. Two submersible wastewater pumps and controls l. Odor control unit m. PVC Sewer force main n. Instrumentation o. Variable frequency drives p. Lighting and power with new 3-phase electrical service q. Temporary sewer bypass |
||||||||||||||||||||||||||||||||||||||||||||||
Details | Lift and Pump Stations, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |