Similar Projects
2021 Capital Improvement Project - Phase 1 - HVAC
Infrastructure, Renovation
Sub-Bidding
$800,000 CJ est. value
Cheektowaga, NY 14225

2021 Capital Improvement Project - Phase 1 - Electrical
Infrastructure, Renovation
Sub-Bidding
$200,000 CJ est. value
Cheektowaga, NY 14225

2022-2027 Community HVAC and Hot Water Services
Term Contract
Post-Bid

Hvac Equipment Maintenance And Related Services
Term Contract
Post-Bid

UVGI System Installation
Alteration
Results
Buffalo, NY 14203

Cooke Hall - Chilled Water Upgrades at Building Entrance
Alteration
Results
Buffalo, NY 14260

Highway Garage HVAC Upgrade and Repairs
Renovation
Sub-Bidding
$200,000 CJ est. value
Hamburg, NY 14075

Renovate Sports Arena Ice Rink Refrigeration System at Buffalo State College
Alteration
Post-Bid
Buffalo, NY 14222

Furnas Hall - Chilled Water Upgrades at Building Entrance
Alteration
Results
Buffalo, NY 14260

Lancaster Opera House HVAC Improvements
Renovation
Sub-Bidding
$250,000 CJ est. value
Lancaster, NY 14086

Replace Various Air Handling Units and Controls at Bacon Hall at Buffalo State
Alteration
Post-Bid
Buffalo, NY 14222

Senior Center HVAC improvements
Alteration
Results
$20,000 est. value
Tonawanda, NY 14150

Lockwood Library - Chilled Water Upgrades at Building Entrance
Alteration
Post-Bid
Buffalo, NY 14228

Senior Center HVAC Improvements
Alteration
Results
Boston, NY 14025

HVAC Replacement at 485 Cayuga Road
Alteration
Post-Bid
Buffalo, NY 14225

Last Updated 04/17/2023 02:38 PM
Project Title

Asb Bsb Chilled Water Modifications

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14202   (Erie County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Roswell Park Cancer Institute is seeking competitive bids for the following project; The basis of the project is to perform modifications to the chilled water lines serving the Administrative Services Building ("ASB") and the Gratwick Basic Sciences Building ("GBSB" or "BSB"). The chilled water system for the ASB building is currently on an independent system, decoupled from the centralized North Plant chilled water system. The purpose of this project is to place the ASB building onto the North Plant chilled water system. The C&V Annex piping will be tied into the new C&V chilled water supply and return. ASB will be converted from glycol to chilled water. The AHU unit serving the Pathology Department (located in the North Building) will be added to the ASB building chilled water system, and a new pump set for the building will be installed. Service-Disabled Veteran-Owned Set Aside: No Total MWBE Participation Goals: 10%

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents