Similar Projects
Cubesmart and Fire Station
New Construction, Build-Out - 97,367 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Oakland Park, FL 33334

Holt Fire Station
New Construction
Conception
$813,000 est. value
Holt, FL

Fire Station 11
New Construction
Design
Orlando, FL

Orlando Fire Station 6
New Construction
Design
Orlando, FL

Construction of Fire Station 2
New Construction, Addition - 1,728 SF
Bidding
$850,000 to $1,000,000 est. value
Bradenton, FL 34208

North Port Fire Rescue Training Tower
New Construction
Bidding
$1,700,000 est. value
North Port, FL 34291

Flagler County Sheriff's Office District 3
New Construction
Sub-Bidding
Bunnell, FL

Cocoa Beach Police Headquarters
New Construction - 28,900 SF
Post-Bid
Less than $8,500,000 est. value
Cocoa Beach, FL

Town of Windermere Town Facilities
New Construction - 9,882 SF
Post-Bid
$5,200,000 est. value
Windermere, FL

Design-Build Construction Delivery Method for New Fire Stations
New Construction - 17,250 SF
Results
Jacksonville, FL

Build a Fire Station in Sumatra
Results
Less than $59,400 est. value
Bristol, Sumatra, FL 32321

Replace Fire Crash Rescue Station, 125th Fighter Wing, Jacksonville, FL
New Construction - 17,400 SF
Construction
$5,000,000 to $10,000,000 est. value
Jacksonville, FL 32218

Fire Station 10
Construction
Port Charlotte, FL 33948

Longwood Fire Station 15/Public Safety Facility
New Construction
Conception
Longwood, FL

SWFD Station Design
Design
Miramar Beach, FL 32550

Last Updated 07/24/2021 02:20 AM
Project Title

Construction of Fire Station No. 5

Physical Address View project details and contacts
City, State (County) Spring Hill, FL 34608   (Hernando County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the construction of a new 11,602 square foot fire station located in Hernando County, FL. Building work includes exterior and interior finishes, equipment, electrical systems, mechanical systems, fire protection, traffic signalization, septic system and plumbing. Site work includes new exterior signage, new sidewalks, asphalt, concrete driveway, parking, retaining wall, septic drain field, site storm water drainage, wildlife management, environmental management and landscape improvements. The structure is composed of concrete slabs on grade, structural brick walls, stucco on concrete masonry unit walls, interior metal stud framing, and TPO roofing on steel joists over metal deck.

Details

1 Fire/Police Station, 11,602 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents