Similar Projects
Katy Crossing Phase 3 - Landscape Improvements
Post-Bid
Cypress, TX 77410

Sims Bayou Greenway Improvements Segment SI04/5
Post-Bid
$8,200,000 est. value
Houston, TX 77024

Safe Sidewalk Program
Results
$1,200,000 est. value
TX

Universal Accessibility Improvements
Results
Less than $9,448,504 est. value
Houston, TX 77002

FY20 Summer Parking Lot Maintenance
Post-Bid
Houston, TX 77204

Intramural Gravel Lot Conversion
Results
Houston, TX 77204

Citywest/Deerwood Sidepath
Post-Bid
$1,000,000 to $2,000,000 est. value
Houston, TX 77000

Improvements to Pedestrian and Transit Stops for Various Locations Throughout Harris County
Results
TX

Parking Lot Expansions and Pavement Replacement at Multiple Locations
Post-Bid
Less than $1,500,000 est. value
Alief, TX 77411

Phase I Hike and Bike Trail in Cypress Creek Park
Results
Houston, TX 77019

TIRZ 25 Sidewalk, Curb and Curb Ramp Assessment Project - West Orem Drive (Pyramid Place to Ambrose Street)
Post-Bid
Houston, TX 77002

Elmside/Woodchase Path
Results
$2,900,000 to $3,300,000 est. value
Houston, TX 77042

Tirz 9 Sidewalk, Curbs and Curb Ramps Assessment Project - Buffalo Speedway (Simsbrook Drive to West Airport Boulevard)
Post-Bid
Houston, TX

Citywide Work Orders for CDSF Project #5
Results
Less than $1,600,000 est. value
Houston, TX 77000

TIRZ 25 Sidewalk, Curbs, and Curb Ramps Assessment Project - South Post Oak Road (Anderson Street to US 90 ALT)
Post-Bid
Houston, TX 77002

Last Updated 07/09/2021 04:24 PM
Project Title

Construction of Elyson Basin B Phase 3 Trail

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work for the Contract includes, but is not limited to, the construction concrete trail, concrete pads, and site furnishings.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents