Similar Projects
Marcy Gulch Lift Station Project
New Construction
Post-Bid
Highlands Ranch, CO 80129

Lift Station A And Force Main Project
Post-Bid
Northglenn, CO 80241

Grandview Pump Station Phase I: Building Improvements and/or Phase 2 and Site Improvements Projects
Renovation
Results
Durango, CO 81301

Smoky Hill Pump Station Improvements
Results
$3,200,000 to $3,670,000 est. value
Aurora, CO 80012

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

The Lakes at Centerra Metropolitan District Lakes Phase 7 Non-Potable Pump House
Post-Bid
Loveland, CO 80537

Gun Club Road Pump Station Major Improvements Project
Results
$5,000,000 to $5,400,000 est. value
Aurora, CO

Waterbury Lift Station 2019 Repairs
Post-Bid
Centennial, CO 80011

Ridgegate First Street Lift Station
Results
Lone Tree, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Oak Grove Elementary School Christmas Break Sewage Lift Station Upgrade Project
Results
Montrose, CO

United Reservoir North Cell Pump Station
Post-Bid
Greenwood Village, CO

Lift Station Upgrades Project in Greenwood Village
Results
Less than $1,544,555 est. value
Greenwood Village, CO

Chambers Reservoir Remediation Project Phase II
Post-Bid
Greenwood Village, CO 80111

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Reported 04/21/2021 12:00 AM
Project Title

Zone 3/4 Pump Station MCC Replacement and VFD Install

Physical Address View project details and contacts
City, State (County) Thornton, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Thornton is replacing two (2) existing motor control centers (MCC-North and MCC-South) and replacing existing motor starters with new variable frequency drives (VFDs) on two (2) existing pumps (P3-3 and P4-3) in the Zone 3/4 Pump Station. Work shall be phased to maintain operation of one (1) MCC at all times, and outages of MCC’s shall be minimized.

Details

Lift and Pump Stations, Renovation.
Division 11 - Equipment, Common Work Results for Equipment, Common Motor Requirements for Equipment.
Division 33 - Utilities, Wastewater Utility Pumping Stations, Packaged Utility Wastewater Pumping Stations, Public Utility Wastewater Pumping Stations.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents