Similar Projects
Brown Intermediate & Polson Middle Courtyard/Entry/Main Office
New Construction, Renovation
Design
Madison, CT 06443

Construction Manager at Risk - Construction Manager at Risk for the New Madison Elementary School
New Construction - 87,500 SF
Bidding
$61,100,000 est. value
Madison, CT 06443

East Haven High School LMC Workspace Renovation
Renovation
Post-Bid
East Haven, CT

North Branford High School Phase II
New Construction, Renovation - 124,000 SF
Post-Bid
North Branford, CT 06471

Main Entryway Improvements
Renovation
Results
$953,500 est. value
Cheshire, CT 06410

Elevator Cylinder Replacement
Results
Milford, CT

Platt Tech
New Construction - 237,000 SF
Construction
$92,000,000 est. value
Milford, CT

New High School
New Construction - 106,100 SF
Construction
$56,900,000 to $66,242,390 est. value
North Branford, CT 06471

OPS Locker Room Storage Project - Fire Code and Construction
Renovation
Post-Bid
Oxford, CT 06478

Construction Management at Risk Services for the Pre-Construction and Construction Project of Hamden Middle School
Results
Hamden, CT 06518

Soundproof Wall Construction for Manufacturing Workshop
Renovation
Post-Bid
East Haven, CT 06513

Entrance Upgrades at Joseph Foran High School
Renovation
Results
Milford, CT 06460

Amity Middle School Bethany Interior Courtyard Repair Services
Renovation
Post-Bid
$179,000 est. value
Bethany, CT 06524

Entrance Upgrades at East Shore Middle School
Renovation
Results
Milford, CT 06460

District Wide Elevator Maintenance
Alteration
Post-Bid
Naugatuck, CT

Reported 07/18/2022 12:11 PM
Project Title

Sheehan High School New Elevator - Wallingford Public Schools

Physical Address View project details and contacts
City, State (County) Wallingford, CT 06492   (New Haven County)
Category(s) Education, Single Trades
Sub-Category(s) Conveying Systems, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call to design of a new elevator at Sheehan High School. As of July 15, 2022, this project is in the planning phase. An engineer has not been selected. A firm construction timeline has not been determined.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents