Similar Projects
Serene Lake Elementary Additions and Partial Replacements - Mukilteo School District
Addition, Demolition, Renovation, Infrastructure
Conception
$20,000,000 CJ est. value
Edmonds, WA 98026

Explorer Middle School Additions and Partial Replacements - Mukilteo School District
Addition, Demolition, Renovation, Infrastructure
Conception
$30,000,000 CJ est. value
Everett, WA 98204

I-405/SR 522 to SR 527 - Widening and Express Toll Lane
Infrastructure
Design
$510,000,000 CJ est. value
Bothell, WA 98012

SR 524/Olympic Ave Vic To 48th Ave W Vic - ADA Compliance
Infrastructure
Design
$2,296,000 CJ est. value
Snohomish, WA 98296

South MATOC IDIQ On-Ramp
New Construction
Post-Bid
Less than $30,000,000 est. value

Whitehorse Trail Improvements
Renovation, Alteration
Post-Bid
WA

GAOA Alt/Repair Construction Services MATOC
Renovation
Results

USPS IQ JOC Washington
New Construction, Renovation
Results
Less than $10,000,000 est. value

Northwest Washington Rehab Hospital
New Construction, Infrastructure - 52,500 SF
Pending Verification
$15,000,000 CJ est. value
Lynnwood, WA 98087

Behavioral Health Center - Tulalip Tribe / Lake Ketchum
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Lake Ketchum, WA 98292

270th Street NW Self Storage Facility
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Stanwood, WA 98292

SR 529/NB Snohomish River - Bridge Rehabilitation
Infrastructure, Renovation
Design
$8,876,000 CJ est. value
Everett, WA 98201

Rapid Response Single Award Task Order Contract (SATOC)
New Construction
Post-Bid
Less than $95,000,000 est. value

Tower Site Readiness Phase III Project
Infrastructure
Results
Arlington, Bothell, Darrington, Everett, Monroe, WA 98241

North Creek Commerce Center
Demolition, New Construction, Infrastructure - 250,000 SF
Pending Verification
$100,000,000 CJ est. value
Bothell, WA 98012

Last Updated 05/06/2023 06:33 PM
Project Title

Everett Smelter Plume Yard Soil Removal and Restoration

Physical Address View project details and contacts
City, State (County) Everett, WA 98201   (Snohomish County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $4,300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Engineer estimate: $3,500,000 - $4,300,000. For additional information, contact Erika Lindsey by email at erli461@ecy.wa.gov Ph: (360) 280-5697 The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents