Similar Projects
Attoyac Bayou Site 21 Remedial Repairs In Nacogdoches County, Texas
Term Contract
Design
$100,000 to $250,000 est. value

Attoyac Bayou Site 21 Remedial Repairs In Nacogdoches County, Texas
Term Contract
Design
$100,000 to $250,000 est. value

Oak Park Storm Outfall and Park 8 Detention Pond
Infrastructure
Bidding
$200,000 est. value
Houston, TX

Stewart A (ML06k) Drainage Improvements Project
Infrastructure
Bidding
$300,000 est. value
Mission, TX 78572

Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Katy Lakes Section 5
Post-Bid
TX

Park Street Paving and Drainage Improvements
Post-Bid
Pasadena, TX 77506

Proposed Montgomery Crossing Highway 59 and Montgomery Pines Road
Results
Porter Heights, TX

Formal-CSP Rehabilitation of Container Yard 3 North at Barbours Cut Terminal
Results
Houston, TX

Faysville Drain Improvements-2018 Bond Referendum Project No. 11B
Infrastructure
Post-Bid
$800,000 est. value
TX

Town Creek Crossing Section 1
Results
TX

Drain Improvements
Infrastructure
Post-Bid
TX

Chapel Run Phase I Detention and Mass Grading
Results
Conroe, TX

Lower East Fork Laterals of the Trinity Watershed Floodwater Retarding Structure No. 3 Upgrade
Infrastructure
Post-Bid
$2,200,000 to $3,200,000 est. value
TX

Construction of the Detention Pond C Expansion and Drainage Facilities to Serve Amira
Results
Houston, TX

CDBG-DR 2017 Paving and Drainage Improvements for Chelsea Street, Mimosa Street, Cedar Street, and Larch Lane
Infrastructure
Post-Bid
$3,400,000 est. value
Bellaire, TX 77401

Last Updated 06/13/2022 04:37 AM
Project Title

Big Sandy Creek Watershed Floodwater Retarding Structure, Site No. 44 Upgrade

Physical Address View project details and contacts
City, State (County) Aurora, TX   (Wise County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $11,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrades to the existing structure include maintaining the existing principal spillway crest and normal pool elevation; adding additional rock riprap on the upstream slope; raising the embankment by 6 feet with compacted fill to an elevation of 789.0 feet, flattening the downstream slope to 3H:1V; extending the embankment through the existing earthen auxiliary spillway; constructing a roller compacted concrete auxiliary spillway over the embankment along the existing principal spillway alignment with a stilling basin on the downstream end; grouting portions of the existing principal spillway conduit in-place and removing the existing riser; and installing a new principal spillway consisting of a 48-inch diameter conduit installed using microtunneling methods and covered baffle inlet riser offset to the right of the existing alignment.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents