Similar Projects
Last Updated | 12/17/2020 09:23 AM |
Project Title | US 78 Phase 2B Infrastructure Improvements |
Physical Address | View project details and contacts |
City, State (County) | Saint George, SC 29477 (Dorchester County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes improvements to 3.527 miles of US 78. The total project length is 4.102 miles. The project includes shoulder improvements throughout the entire 3.527 mile project with 1.40 miles of two-lane road being widened to three lanes and 0.93 miles of roadway being widened to five lanes. One existing reinforced concrete box culvert will be replaced with a 6’ x 6’ cast-in-place culvert. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |