Similar Projects
Lathrop High School Kitchen Remodel - Fairbanks North Star County
Addition, Demolition, Renovation, Infrastructure
Conception
$2,200,194 CJ est. value
Fairbanks, AK 99701

Pearl Creek Elementary School Traffic Safety - Fairbanks North Star County
Infrastructure
Conception
$1,530,000 CJ est. value
Fairbanks, AK 99709

FTW469 Repair Barracks B3718
Renovation - 24,000 SF
Design
$50,000,000 CJ est. value
Fairbanks, AK 99703

Elevator install and Fire Safety Update
Renovation
Design
$500,000 CJ est. value
Eielson AFB, AK 99702

Pioneer Park Water And Sewer Improvements
Infrastructure
Bidding
$2,500,000 CJ est. value
Fairbanks, AK 99701

Pioneer Park Water And Sewer Improvements
Infrastructure
Bidding
$2,500,000 CJ est. value
Fairbanks, AK 99701

Animal Shelter Replacement
New Construction, Infrastructure
Post-Bid
$14,330,000 CJ est. value
Fairbanks, AK 99712

Dalton Hwy MP 0-9 Reconstruction CMGC
Infrastructure
Post-Bid
$30,000,000 to $40,000,000 est. value
Fairbanks, AK

Lombardo Drive - Road Improvements
Term Contract
Results

Airport Way (West) Improvements and Airport Way West Bicycle/Pedestrian Facility
Infrastructure
Results
$10,000,000 to $20,000,000 est. value
Fairbanks, AK

Old Richardson Highway Intersection Improvements - State of Alaska
Infrastructure
Pending Verification
$830,000 CJ est. value
Fairbanks, AK 99705

Old Richardson Highway Intersection Improvements - State of Alaska
Infrastructure
Pending Verification
$830,000 CJ est. value
Fairbanks, AK 99705

Baseball Consolidation at Growden Park - Fairbanks North Star County
Infrastructure
Conception
$1,525,350 CJ est. value
Fairbanks, AK 99701

Yankovich-Miller Hill Road Reconstruction and Multi-Use Path
Infrastructure
Design
$925,000 CJ est. value
Fairbanks, AK 99709

Chena River State Recreation Area: Stiles Creek Outdoor Shooting Range Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Fairbanks, AK 99712

Last Updated 10/02/2023 11:33 PM
Project Title

Renovate Munitions Inspection Facility, Building 1324

Physical Address View project details and contacts
City, State (County) Eielson AFB, AK 99702   (Fairbanks North Star County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Military Facility, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $7,177,346 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Sep 28, 2023 Contract Award Number: FA500423C0017 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: RVE7GUNB8G57 Contractor Awarded Name: AMES 1, LLC Contractor Awarded Address: Anchorage, AK 99501 USA Base and All Options Value (Total Contract Value): $7,177,346.00 Amendment 07 - The purpose of this amendment is to extend the response time from 15 March 23 to 31 March 23 1400 AKDT in order to allow ample time for review of the Questions and Answers (Q&A). Additionally, part two of the submitted bidder questions in regards to this project will be posted. A separate amendment will be issued to provide the additional Q&A documents, along with any applicable additional supporting documentationSol No : FTQW18-0204, FTQW_18_0204_Presolicitation_Notice The work includes work on multiple facilities in support of the F35 beddown at Eielson AFB. Work primarily occurs in Building 1324, Munitions Inspection Facility but additional work occurs in nearby facilities and utilidor. Work in adjacent buildings includes building demolition, heating system improvements, installation of water line recirculation system, and paving. Work in Building 1324 includes reconfiguration of the interior to divide the single bay into two separate bays and to construct an interior administrative area. Additional work includes construction of a fire suppression system, roof replacement, improvements and certification of the Lightning Protection System, and incidental related work. The magnitude for this requirement IAW FAR 36.204(g) is between $1,000,000.00 and $5,000,000.00. The work includes work on multiple facilities in support of the F35 beddown at Eielson AFB. Work primarily occurs in Building 1324, Munitions Inspection Facility but additional work occurs in nearby facilities and utilidor. Work in adjacent buildings includes building demolition, heating system improvements, installation of water line recirculation system, and paving. Work in Building 1324 includes reconfiguration of the interior to divide the single bay into two separate bays and to construct an interior administrative area. Additional work includes construction of a fire suppression system, roof replacement, improvements and certification of the Lightning Protection System, and incidental related work. The magnitude for this requirement IAW FAR 36.204(g) is between $1,000,000.00 and $5,000,000.00. Amendment 0001 - Change FAR 52.236-27 Amendment 0002 - The purpose of this amendmnet is to: 1). Extend due date of bids until 7 February 2023 at 1400. 2). Extend question due date until 18 January 2023 at 1400. 3). Change the Period of Performance from 365 days to 727 days. 4). Add Attachment 7- Anticipated Schedule in Accordance with Specification 01 14 00 Section 1.4. 5). Update FAR 52.211-10 and FAR 52.225-9 6). Update delivery and inspection in section F from 365 calendar days to 727 calendar days. 7). Add attachment 3 - Construction Final Drawings (11x17) (Specifications_Drawings) Amendment 0003 - The Purpose of this amendment is to: 1). Extend due date of bids until 7 February 2023 at 1400. 2). Extend question due date until 18 January 2023 at 1400. 3). Add photos of the mechanical room. Amendment 04 - The purpose of this amendment is to: 1).Extend the response time from 7 Feb 23 to 28 Feb 23 in order to allow ample time for review of the Questions and Answers (Q&A). A separate amendment will be issued to provide the Q&A document, along with any applicable additional supporting documents. **Note when submitting your bids please ensure the solicitation as well as all of the amendments are signed, if there are any questions please reach out.** *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions will be answered in the form of an amendment to the solicitation and posted to the SAM.gov website. All questions must be emailed to both emails above. No questions will be taken over the phone. We will allow additional questions in regards to the mechanical room only until 1 March 23 14:00L.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents