Similar Projects
Address Pavement Condition of I-471
Infrastructure
Conception
$5,780,000 CJ est. value
Newport, KY 41071

Amador / Newport
New Construction, Infrastructure - 6,400 SF
Design
$2,000,000 CJ est. value
Newport, KY 41071

Thermo Fisher - PPD Laboratories Expansion
Addition, Demolition, Infrastructure - 43,000 SF
Design
$59,000,000 CJ est. value
Highland Heights, KY 41076

Highland Heights and Silver Grove Pump Station Improvements
Infrastructure, Renovation
Bidding
$1,500,000 CJ est. value
Highland Heights, KY 41076

Asphalt Resurfacing - KY 9
Infrastructure
Bidding
$2,000,000 CJ est. value
Alexandria, KY 41001

Traffic Signal Pole Replacement
Infrastructure
Post-Bid
$70,000 CJ est. value
Newport, KY 41071

Campbell Call 108
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Alexandria, KY 41001

AJ Jolly Park ADA Accessible and Inclusive Playground
Renovation, Infrastructure
Results
$200,000 est. value
Newport, KY

AJ Jolly Park Bath House
Addition - 1,870 SF
Results
$180,000 to $300,000 est. value
Alexandria, KY 41001

Memorial Pointe
New Construction, Infrastructure
Pending Verification
$65,000,000 CJ est. value
Southgate, KY 41071

Gloria Terrell Drive Industrial Development
New Construction, Infrastructure - 350,000 SF
Pending Verification
$40,000,000 CJ est. value
Highland Heights, KY 41076

33 N. Ft. Thomas Ave. Wall Facing
Infrastructure
Post-Bid
$200,000 CJ est. value
Fort Thomas, KY 41075

Grade and Drain - US 27
Infrastructure
Results
$600,000 est. value
Alexandria, KY 41001

Newport Multi-Residential
New Construction, Infrastructure
Pending Verification
$320,000,000 CJ est. value
Newport, KY 41071

Licking River Siphon Conveyance Upsizing Phase II
Infrastructure
Post-Bid
$5,032,000 CJ est. value
Wilder, KY 41071

Last Updated 04/17/2023 12:35 PM
Project Title

Cold Spring Municipal Park Pickleball Courts

Physical Address View project details and contacts
City, State (County) Cold Spring, KY 41076   (Campbell County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $360,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For furnishing all labor, materials, and equipment necessary to complete the project known. This project shall include all work necessary to construct new asphalt pickleball courts including all associated coatings, striping, netting, fencing, etc. as well as all site work and storm sewer. The bidder to whom the contract is awarded will be required to furnish a surety bond in an amount equal to one hundred percent (100%) of the contract amount. The successful bidder will be required to have a current occupational license in the City of Cold Spring before the Contract will be awarded. Proposals must contain the full name of the party or parties submitting the same and all persons interested therein. Questions received less than five (5) days prior to bid date cannot be answered The Contractor shall do all the work and furnish all the materials, except as herein otherwise specified, necessary or proper for performing and completing the work of the Contract. The methods, materials, and appliances used, therefore, must be such as will produce the quality of work specified and ensure safety to the public and property. Access to abutting properties shall be maintained at all times except for temporary periods as herein stated. In the event the Contractor will be temporarily blocking the access to any property during some period of construction, he must notify all residential or business occupants at least 24 hours before said blockage to allow them time to move any vehicles in or out. No blocking of traffic will be allowed during the peak traffic hours of 6:30 - 8:30 AM and 4:30 - 6:30 PM. The contractor may temporarily block traffic for placement and/or removal of materials (i.e. concrete trucks, stone trucks, dump trucks, etc.). The length of closure should only be the time it takes to empty or load a truck and not exceed 15 minutes. All stacked traffic must be allowed to clear the roadway after each 15-minute period of closure before another period of closure is permitted. Construction work shall take place between the hours of 7:00 A.M. to 7:00 P.M., Monday through Saturday.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents