Similar Projects
New Riverside Park / Barn Site - 00085 - Town of Bluffton
Infrastructure
Conception
$3,872,112 CJ est. value
Bluffton, SC 29909

Buck Island Road Drainage Improvements - 00100 - Town of Bluffton
Infrastructure
Conception
$87,500 CJ est. value
Bluffton, SC 29910

Desai Hotel / Beaufort
New Construction, Infrastructure - 3,600 SF
Design
$30,000,000 est. value
Beaufort, SC

Coastal States Bank / Beaufort
New Construction, Infrastructure - 2,800 SF
Design
$700,000 CJ est. value
Beaufort, SC 29902

RFQ Engineering - Engineering and Consulting Services for Beaufort County Solid Waste and Recycling
Infrastructure
Bidding
$80,000 CJ est. value
Beaufort, SC 29902

Okatie River Park
Infrastructure, Renovation
Bidding
$1,300,000 CJ est. value
Bluffton, SC 29910

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Buckwalter Recreation Complex Expansion (BRACE) - Beauford County
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Bluffton, SC 29910

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Cordillo Courts Restroom and Parking Project Completion
Infrastructure
Results
$176,049 CJ est. value
Hilton Head Island, SC 29928

Pine Court Apartments
New Construction, Infrastructure
Construction
$6,000,000 CJ est. value
Beaufort, SC 29902

Harris Teeter at Lady's Island
New Construction, Infrastructure - 60,850 SF
Construction
$15,000,000 CJ est. value
Beaufort, SC 29907

Washington Square East
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Bluffton, SC 29910

Okatie Crossing Shopping Center / Hardeeville
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Okatie, SC 29909

Dev Plan - Pritchardville Elementary School Modular Classrooms - Ward Edwards Engineering
Addition, Demolition, Infrastructure - 7,800 SF
Conception
$1,000,000 CJ est. value
Bluffton, SC 29910

Last Updated 10/09/2023 02:05 AM
Project Title

Pigeon Point Neighborhood Galvanized Water Line Replacement

Physical Address View project details and contacts
City, State (County) Beaufort, SC 29902   (Beaufort County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,537,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of providing all labor, materials, and equipment for replacing existing undersized galvanized water lines with new four (4)-inch and six (6)-inch water lines along various roads in the Pigeon Point Neighborhood in the City of Beaufort, Beaufort County, South Carolina. Question Deadline 09/19/2023 at 4:00 PM ET Each request for such interpretation should be in writing, submitted to Tammy Holman, Procurement & Risk Manager, tammy.holman@bjwsa.org.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents