Similar Projects
Moose Lake Truck Station Campus - General
Results
Less than $3,250,000 est. value
Moose Lake, MN 55767

Inverpoint Business Center - Building 3
New Construction - 107,838 SF
Design
$10,000,000 CJ est. value
Inver Grove Heights, MN 55076

Glenwood Area Storage Building - General
New Construction
Post-Bid
$189,001 est. value
Glenwood, MN

MnDOT Northfield Truck Station Campus - General
New Construction
Bidding
$4,674,000 est. value
Northfield, MN 55057

Freeborn-Mower Cooperative Services Headquarters
New Construction - 97,800 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Albert Lea, MN

New Flyer CAD Building
Addition - 11,250 SF
Post-Bid
Crookston, MN 56716

Kindeva Drug Delivery Warehouse
New Construction - 136,200 SF
Design
$10,000,000 CJ est. value
Woodbury, MN 55129

MnDOT Sleepy Eye Truck Station-General
Results
Less than $4,400,000 est. value
Sleepy Eye, MN 56085

Amazon Warehouse
New Construction - 750,000 SF
Conception
$10,000,000 CJ est. value
Lakeville, MN

Mickelson Invesments Building
New Construction - 12,700 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Clearwater, MN

MNDOT Mnroads Barn Insulation
Post-Bid
Monticello, Otsego, MN 55301

Last Updated 03/18/2021 09:38 AM
Project Title

Salt Storage Shed

Physical Address View project details and contacts
City, State (County) MN   (Aitkin County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the furnishing of all labor and materials for the construction complete in-place, of the following approximate quantities: 1 L S Mobilization 360 S Y Geotextile Fabric Type 5 1 L S Site Grading 85 TON TYPE SP 9.5 Wearing Course Mixture (3,C) 1 STR Storage Building

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents